Employing a study of the robustness metrics to assess the reliability of dynamic loop scheduling ∗

نویسندگان

  • Srishti Srivastava
  • Florina M. Ciorba
  • Ioana Banicescu
چکیده

To achieve best performance, scientific applications are executed on parallel and distributed heterogeneous computing systems. These applications often are computationally intensive, data parallel, irregular, and usually contain large loops that exhibit non-uniform characteristics depending upon their semantic structure during execution. These loops are the most data parallel and computationally intensive part of the applications, and therefore, the main focus of this work is on loop iterations scheduling. Improper scheduling of such loop iterations may lead to load imbalance, which is the dominant factor for performance degradation. A number of dynamic loop scheduling (DLS) techniques have been developed to address the issue of load imbalance for scientific applications on dynamically changing environments. The increasing demand for faster execution of iterations in larger simulations of more complex application models require that DLS provide robust, on-demand performance, on dynamically scalable, high performance computing systems. To evaluate the robustness of these DLS techniques two robustness metrics have previously been formulated to guarantee flexibility and resilience. In this work, we describe simulations of DLS techniques using Alea, a GridSim-based scheduling simulator. Based on the simulation results, we calculate the robustness metrics and show how to use them to determine the most robust DLS techniques.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Definition of General Operator Space and The s-gap Metric for Measuring Robust Stability of Control Systems with Nonlinear Dynamics

In the recent decades, metrics have been introduced as mathematical tools to determine the robust stability of the closed loop control systems. However, the metrics drawback is their limited applications in the closed loop control systems with nonlinear dynamics. As a solution in the literature, applying the metric theories to the linearized models is suggested. In this paper, we show that usin...

متن کامل

Performance assessment of appointment system in managing outpatients’ waiting time in a general hospital: A Case study

Background: Appointment scheduling system is a critical component in controlling patients’ waiting time, so can increase the efficiency and timely access to health services. It is also an important determinant of patient satisfaction. The aim of this study was to assess the relationship of using a scheduling system and outpatients’ waiting time in a general teaching hospital in Tehran, Iran. M...

متن کامل

RELIABILITY-BASED DESIGN OPTIMIZATION OF COMPLEX FUNCTIONS USING SELF-ADAPTIVE PARTICLE SWARM OPTIMIZATION METHOD

A Reliability-Based Design Optimization (RBDO) framework is presented that accounts for stochastic variations in structural parameters and operating conditions. The reliability index calculation is itself an iterative process, potentially employing an optimization technique to find the shortest distance from the origin to the limit-state boundary in a standard normal space. Monte Carlo simulati...

متن کامل

A New Approach Generating Robust and Stable Schedules in m-Machine Flow Shop Scheduling Problems: A Case Study

This paper considers a scheduling problem with uncertain processing times and machine breakdowns in industriall/office workplaces and solves it via a novel robust optimization method. In the traditional robust optimization, the solution robustness is maintained only for a specific set of scenarios, which may worsen the situation  for new scenarios. Thus, a two-stage predictive algorithm is prop...

متن کامل

Multi-objective optimization of time-cost-quality-carbon dioxide emission-plan robustness in construction projects

Today, the construction industry is facing intense competition and success in this competition depends on several factors. Project managers try to minimize project time and cost, carbon dioxide emission and at the same time maximizing the quality of project and its plan robustness. In this paper, study construction project scheduling considering a discrete trade-off between time, cost, quality,...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010