Cautious Analysis of Project Risks by Interval-Valued Initial Data

نویسنده

  • Lev V. Utkin
چکیده

One of the most common performance measures in selection and management of projects is the Net Present Value (NPV). In the paper, we study a case when initial data about the NPV parameters (cash flows and the discount rate) are represented in the form of intervals supplied by experts. A method for computing the NPV based on using random set theory is proposed and three conditions of independence of the parameters are taken into account. Moreover, the imprecise Dirichlet model for obtaining more cautious bounds for the NPV is considered. Numerical examples illustrate the proposed approach for computing the NPV.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Extended Analytical Hierarchy Process Technique with Incomplete Interval-valued Information for Risk Assessment in IT Outsourcing

Information technology (IT) outsourcing has been recognized as a new methodology in many organizations. Yet making an appropriate decision with regard to selection and use of these methodologies may impose uncertainties and risks. Estimating the occurrence probability of risks and their impacts organizations goals may reduce their threats. In this study, an extended analytical hierarchical proc...

متن کامل

A NEW MULTI-OBJECTIVE OPTIMIZATION APPROACH FOR SUSTAINABLE PROJECT PORTFOLIO SELECTION: A REALWORLD APPLICATION UNDER INTERVAL-VALUED FUZZY ENVIRONMENT

Organizations need to evaluate project proposals and select the ones that are the most effective in reaching the strategic goals by considering sustainability issue. In order to enhance the effectiveness and the efficiency of project oriented organizations, in this paper a new multi-objective decision making (MODM) approach of sustainable project portfolio selection is proposed which applies in...

متن کامل

Safety Risks Impacts Analysis on Construction Project Objectives Using a Hybrid Model of Fuzzy Expert System and Latin Hyper Cube Sampling

Background and aims: The construction industry has a high rate of fatal or nonfatal injuries and all around the world which remains one of the most dangerous occupations till now. Since project safety and measuring danger in the construction industry is a crucial subject, so this study aimed to measure the impacts of safety risks on the time and cost objectives of project using a hybrid method ...

متن کامل

An Assessment Method for Project Cash Flow under Interval-Valued Fuzzy Environment

Effective project management requires reliable knowledge of cash required in different stages of project life cycle. Getting this knowledge is highly dependent on sophisticated consideration of project environment. Nature of projects and their environments are associated with uncertain conditions. In this paper, a new project cash flow assessment method based on project scheduling is proposed t...

متن کامل

Supplier selection with multi-criteria group decision making based on interval-valued intuitionistic fuzzy sets (case study on a project-based company)

Supplier selection can be considered as a complicated multi criteria decision-making problem.In this paper the problem of supplier selection is studied in the presence of conflicting evaluations and insufficient information about the criteria and different attitudes of decision makers towards the risk. Most of fuzzy approaches used in multi-criteria group decision making (MCGDM) are non-intuiti...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems

دوره 14  شماره 

صفحات  -

تاریخ انتشار 2006