Finding the critical path in an activity network with time-switch constraints
نویسندگان
چکیده
An activity network is an acyclic graph with non-negative weights and with a unique source and destination. A project consisting of a set of activities and precedence relationships can be represented by an activity network and the mathematical analysis of the network provides useful information for managing the project. In a traditional activity network, it is assumed that an activity always begins after all of its preceding activities have been completed. This assumption may not be adequate enough to describe some practical applications where some forms of time constraints are attached to an activity. In this paper, we investigate one type of time constraint called time-switch constraint which assumes that an activity begins only in a speci®ed time interval of a cycle with some pairs of exclusive components. Polynomial time algorithms are developed to ®nd the critical path (or longest path) and analyze the ̄oat of each arc in this time-constrained activity network. The analysis shows that the critical path and ̄oat in this context dier from those of a traditional activity network in some management perspectives and thus, consideration of the time-switch constraint leads to enhanced project management through more eective use of budgets and resource allocation. Ó 2000 Elsevier Science B.V. All rights reserved.
منابع مشابه
An Algorithm to Obtain Possibly Critical Paths in Imprecise Project Networks
We consider criticality in project networks having imprecise activity duration times. It is well known that finding all possibly critical paths of an imprecise project network is an NP-hard problem. Here, based on a method for finding critical paths of crisp networks by using only the forward recursion of critical path method, for the first time an algorithm is proposed which can find all pos...
متن کاملAnalysis of critical paths in a project network with random fuzzy activity times
Project planning is part of project management, which is relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment. Initially, the project scope is defined and the appropriate methods for completing the project are determined. In this paper a new approach for the critical path analyzing a project network with random fuzzy activi...
متن کاملالگوریتم جدیدی برای تحلیل حساسیت مسیر بحرانی در شبکه های پرت با درنظر گرفتن ریسک های موجود در پروژه
Taking into account, the uncertain time duration for each activity in a pert network, we would need to accept the notion that the critical path of the project could also vary a number of times during its execution. If these variations take place frequently during the project in an unpredictable manner, it could endanger the efficient management of that project, and in addition to lengthening th...
متن کاملFinding the Optimal Path to Restoration Loads of Power Distribution Network by Hybrid GA-BCO Algorithms Under Fault and Fuzzy Objective Functions with Load Variations
In this paper proposes a fuzzy multi-objective hybrid Genetic and Bee colony optimization algorithm(GA-BCO) to find the optimal restoration of loads of power distribution network under fault.Restoration of distribution systems is a complex combinatorial optimization problem that should beefficiently restored in reasonable time. To improve the efficiency of restoration and facilitate theactivity...
متن کاملNear-Minimum-Time Motion Planning of Manipulators along Specified Path
The large amount of computation necessary for obtaining time optimal solution for moving a manipulator on specified path has made it impossible to introduce an on line time optimal control algorithm. Most of this computational burden is due to calculation of switching points. In this paper a learning algorithm is proposed for finding the switching points. The method, which can be used for both ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- European Journal of Operational Research
دوره 120 شماره
صفحات -
تاریخ انتشار 2000