Mine Valuation in the Presence of a Stochastic Ore-Grade Uncertainty

نویسندگان

  • G. W. Evatt
  • P. V. Johnson
  • P. W. Duck
  • S. D. Howell
چکیده

Mining companies world-wide are faced with the problem of how to accurately value and plan extraction projects subject to uncertainty in both future price and ore grade. Whilst the methodology of modelling price uncertainty is reasonably well understood, modelling ore-grade uncertainty is a much harder problem to formulate, and when attempts have been made the solutions take unfeasibly long times to compute. By treating the grade uncertainty as a stochastic variable in the amount extracted from the resource, this paper provides a new approach to the problem. We show that this method is well-posed, since it can realistically reflect the geology of the situation, and in addition it enables solutions to be derived in the order of a few seconds. A comparison is made between a real mine valuation where the prior estimate of ore grade variation is taken as fact, and our approach, where we treat it as an uncertain estimate.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Analyzing the effect of ore grade uncertainty in open pit mine planning; A case study of Rezvan iron mine, Iran

Due to uncertain nature of grade in ore deposits, considering uncertainty is inevitable in geological modelling of resources and mine planning. In other words, uncertainty in grade of mineralized materials, is one of the most significant parameters need attention in mine planning. In this paper, a comparative procedure utilizing Sequential Gaussian Simulation (SGS) and traditional Ordinary Krig...

متن کامل

Resilient Decision Making in Open Pit Short-term Production Planning in Presence of Geologic Uncertainty

Short-term production plans are the basis for operational mine production schedules. They concentrate on making long-term mine plans operationally feasible. Furthermore, some variables such as ore grade and tonnage govern mine production systems and cause uncertainty in the supply of raw materials to the mills. Due to the quality variation of material, short-term production optimization is an u...

متن کامل

Application of stochastic programming for iron ore quality control

Stockpiling and blending play a major role in maintaining the quantity and quality of the raw materials fed into processing plants, especially the cement, iron ore and steel making, and coal-fired power generation industries that usually require a much uniformed feed. Due to the variable nature of such materials, they even come from the same source and the produced ores or concentrates are seld...

متن کامل

A Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning

The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...

متن کامل

Application of truncated gaussian simulation to ore-waste boundary modeling of Golgohar iron deposit

Truncated Gaussian Simulation (TGS) is a well-known method to generate realizations of the ore domains located in a spatial sequence. In geostatistical framework geological domains are normally utilized for stationary assumption. The ability to measure the uncertainty in the exact locations of the boundaries among different geological units is a common challenge for practitioners. As a simple a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010