Commissioning of the First Klystron-based X-band Power Source at Cern

نویسندگان

  • J. Kovermann
  • N. Catalan-Lasheras
چکیده

A new klystron based X-band rf power source operating at 11.994 GHz has been installed and started to be commissioned at CERN in collaboration with CEA Saclay and SLAC for CLIC accelerating structure tests. The system comprises a solid state high voltage modulator, an XL5 klystron developed by SLAC, a cavity based SLED type pulse compressor, the necessary low level rf system including rf diagnostics and interlocks and the surrounding vacuum, cooling and controls infrastructure. The system is designed to produce up to 50 MW rf pulses of 1500 ns pulse width and 50 Hz repetition rate. After pulse compression, up to 100 MW of rf power at 250 ns pulse width will be available in the structure test bunker. This paper describes in more detail this setup and the process of commissioning which is necessary to arrive at the design performance.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

X-band Klystron Development at Slac

The development of X-band klystrons at SLAC originated with the idea of building an X-band Linear Collider in the late 1980’s. Since then much effort has been expended in developing a reliable X-band Power source capable of delivering >50 MW RF power in pulse widths >1.5 μs. I will report on some of the technical issues and design strategies which have led to the current SLAC klystron designs.

متن کامل

Optical klystron FEL scheme for x-ray coherent harmonic generation at ISLF storage ring

The possibility of inserting an optical klystron on the storage ring of an Iranian Light Source Facility as a Synchrotron Radiation Free electron Laser for coherence harmonic generation in the soft x-ray spectrum has been studied. The study has been performed using the 3D FEL simulation code GENESIS 1.3 and in accordance with the available characteristic parameters of ISLF. Different potential ...

متن کامل

Klystron Gun Arcing and Modulator Protection

The demand for 500 kV and 265 amperes peak to power an X-Band klystron brings up protection issues for klystron faults and the energy dumped into the arc from the modulator. This situation is made worse when more than one klystron will be driven from a single modulator, such as the existing schemes for running two and eight klystrons. High power pulsed klystrons have traditionally be powered by...

متن کامل

The Present Status of the Low Energy Neutron Source

The Low Energy Neutron Source (LENS) at Indiana University produced its first neutrons in late 2004, and has been engaged in a series of facility upgrades since that time. Among the important developments over the past two years have been the commissioning of klystron-based RF systems, the demonstration of beam peak proton beam currents of more than 20mA, and the low-power operation of a methan...

متن کامل

A 12 Ghz 50mw Klystron for Support of Accelerator Research*

A 12 GHz 50MW X-band klystron is under development at the SLAC National Accelerator Laboratory Klystron Department. The klystron will be fabricated to support programs currently underway at three European Labs; CERN, PSI, and INFN Trieste. The choice of frequency selection was due to the CLIC RF frequency changing from 30 GHz to the European X-band frequency of 11.99 GHz in 2008. Since the Klys...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 