Orders Loading and Release in Flow Shops including Outsourcing Networks
نویسندگان
چکیده
Purpose of this paper is to analyse and compare the behavior of workload control models in flow shops of both the MTO (Make-To-Order) and MTS (Make-To-Stock) classes. A simulation model has been built, where a manufacturing cell is loaded through an input control mechanism with shop orders coming from a “pool”. The “pool” itself is fed with planned orders coming from an MRP system. The MRP system releases production orders every planned period and the input control mechanism decides for the actual release of work orders. Conclusions are drawn for the performance of the system with or without an MRP system and with or without the input control mechanism in MTO and MTS environments. Compared to the pure flow shop routing, any set of stations might be excluded from the routing or replaced by subcontractors belonging to an outsourcing network of the manufacturing company. Thus, the general flow shop may still show routing variety with respect to routing lengths, though there is one flow direction with outsourcing interruptions.
منابع مشابه
Designing an Outsourcing Model for the Executive Organs of Mazandaran Province (Case Study of Health Networks of Mazandaran Province)
Background and Aim: Today, with the growth of government services and the increase in the workload of organizations due to population growth and increasing the number of citizens receiving services and the lack of government resources in providing manpower as well as the purchase of facilities and machinery The need has led executives to outsource services. Outsourcing is usually used as a way ...
متن کاملScheduling on flexible flow shop with cost-related objective function considering outsourcing options
This study considers outsourcing decisions in a flexible flow shop scheduling problem, in which each job can be processed by either an in-house production line or outsourced. The selected objective function aims to minimize the weighted sum of tardiness costs, in-house production costs, and outsourcing costs with respect to the jobs due date. The purpose of the problem is to select the jobs tha...
متن کاملModeling and scheduling no-idle hybrid flow shop problems
Although several papers have studied no-idle scheduling problems, they all focus on flow shops, assuming one processor at each working stage. But, companies commonly extend to hybrid flow shops by duplicating machines in parallel in stages. This paper considers the problem of scheduling no-idle hybrid flow shops. A mixed integer linear programming model is first developed to mathematically form...
متن کاملEvaluation of loading efficiency of azelaic acid-chitosan particles using artificial neural networks
Objective(s): Chitosan, a biodegradable and cationic polysaccharide with increasing applications in biomedicine, possesses many advantages including mucoadhesivity, biocompatibility, and low-immunogenicity. The aim of this study, was investigating the influence of pH, ratio of azelaic acid/chitosan and molecular weight of chitosan on loading efficiency of azelaic acid in chitosan particles. Mat...
متن کاملA coordinated scheduling system for customer orders scheduling problem in job shop environments
In this study a coordinated scheduling of customer orders (CSCO) system, with the purpose of improving customer order flow time, is proposed for the order-based production system in which several jobs make up a given customer order and nothing is delivered to the customer until the order is complete. The customer order flow time, which elapses between the release of the first job and the comple...
متن کامل