Planning and Scheduling Facility Workload

نویسنده

  • Ryan R. Squires
چکیده

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

D . Ferrin , and D . J . Morrice , eds . SHARED RESOURCE CAPACITY ANALYSIS IN BIOTECH MANUFACTURING Prasad

Simulation is a relatively new tool for business process analysis in the Biotech industry. This paper discusses an application of discrete event simulation in analyzing the capacity needs of a shared resource in the manufacturing facility at Bayer Corporation’s Berkeley site. The SIGMA simulation model was used to analyze the workload patterns, run different workload scenarios, taking into cons...

متن کامل

Performance of Genetic Algorithms for Solving Flexible Job-shop Scheduling Problem

A Job-Shop Scheduling is a process–organized manufacturing facility. Its main characteristics are that a great diversity of jobs is performed. A Job-Shop produces goods (parts) and these parts have one or more alternatives process plans. Each process plan consists of a sequence of a operations and these operations require resources and have certain (predefined) duration on machines. The Job-Sho...

متن کامل

A Particle Swarm Optimization Approach to Joint Location and Scheduling Decisions in A Flexible Job Shop Environment

In traditional scheduling literature, it is generally assumed that the location of facilities are predetermined and fixed in advance. However, these decisions are interrelated and may impact each other significantly. Therefore finding a schedule and facility location has become an important problem as an extension of the well-known scheduling problems. In this research we consider joint decisio...

متن کامل

The Problem of Scheduling Several Products on A Single Facility with the Simulated Annealing Technique

This paper considers the Economic Lot Scheduling Problem, that is, the problem of scheduling several products on a single facility so as to minimize holding and setup costs. Combination of frequency and timing as well as production quantity make this problem Np-hard. A heuristic is developed to obtain a good solution to ELSP. The proposed heuristic makes use of the Simulated Annealing Technique...

متن کامل

The Problem of Scheduling Several Products on A Single Facility with the Simulated Annealing Technique

This paper considers the Economic Lot Scheduling Problem, that is, the problem of scheduling several products on a single facility so as to minimize holding and setup costs. Combination of frequency and timing as well as production quantity make this problem Np-hard. A heuristic is developed to obtain a good solution to ELSP. The proposed heuristic makes use of the Simulated Annealing Technique...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014