Precedence Constraint Posting for the RCPSP with Uncertain, Bounded Durations
نویسندگان
چکیده
The Resource Constrained Project Scheduling Problem is an important problem in project management, manufacturing and resource optimization. We focus on a variant of RCPSP with time lags and uncertain activity durations. We adopt a Precedence Constraint Posting approach and add precedence constraints to the original project graph so that all resource conflicts are solved and a consistent assignment of start times can be computed for whatever combination of activity durations. We propose a novel method for computing resource conflicts based on the minimum flow on the resource graph and we use it in an efficient complete search strategy. We test the approach on instances coming from the scheduling of parallel applications on multi processor systems on chip.
منابع مشابه
A Min-Flow Algorithm for Minimal Critical Set Detection in Resource Constrained Project Scheduling
We propose a min-flow algorithm for detecting Minimal Critical Sets (MCS) in Resource Constrained Project Scheduling Problems (RCPSP). The MCS detection is a fundamental step in the Precedence Constraint Posting method (PCP), one of the most successful approaches for the RCPSP. The proposed approach is considerably simpler compared to existing flow based MCS detection procedures and has better ...
متن کاملA Precedence Constraint Posting Approach for the RCPSP with Time Lags and Variable Durations
Resource Constrained Project Scheduling Problem is a very important problem in project management, manufacturing and resource optimization. We focus on a variant of RCPSP with time lags and variable activity durations. The solving approach is based on Precedence Constraint Posting that adds new precedence constraints to the original project graph so that all resource conflicts are solved and a ...
متن کاملROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS I. A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA APPROACH
This paper, we presents a new primary-secondary-criteria scheduling model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations (UD) and cash flows (UC). The RCPSP-UD-UC approach producing a “robust” resource-feasible schedule immunized against uncertainties in the activity durations and which is on the sampling-based scenarios may be evaluated from a cos...
متن کاملA UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS
In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The esse...
متن کاملROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS II. SOUNDS OF SILENCE: A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA HARMONY SEARCH METAHEURISTIC
In this paper, we present a new idea for robust project scheduling combined with a cost-oriented uncertainty investigation. The result of the new approach is a makespan minimal robust proactive schedule, which is immune against the uncertainties in the activity durations and which can be evaluated from a cost-oriented point of view on the set of the uncertain-but-bounded duration and cost param...
متن کامل