Comparison and Renaissance of Classic Line-of-Balance and Linear Schedule Concepts for Construction Industry

نویسندگان

  • Yi Su
  • Gunnar Lucko
چکیده

Line-of-Balance (LOB) is a useful analytical tool for repetitive activities in construction projects, which allows showing which crew is assigned to what repetitive work unit of an activity. LOB is closely related to the linear scheduling method, but possesses some challenges: It must be clarified how it counts, as previous studies displayed an apparent measurement gap at the origin, implicitly representing that LOB starts at the first unit finish. Slopes in linear scheduling and LOB are different, even though both portray a measure of progress of an activity. This paper therefore tracks evolution and current use of LOB versus linear schedules. Its contribution to the body of knowledge is threefold: First, based on a literature review, LOB is found to be rooted in Activity-on-Arrow (AOA) diagrams, which makes it event-centered, not progresscentered. Differences in representing the start and productivity between LOB and linear scheduling are reviewed and explained both mathematically and graphically. Second, different LOB concepts are extracted and assessed to facilitate comparing LOB from its original use in manufacturing against the limited application of its objective chart in the construction industry. Third, a mathematical formulation based on singularity functions is developed, which can model staggering, continuity, and interruptability scenarios. Fourth, the repetitive nature of LOB and LSM enables resource-specific equations that model the level of detail of individual crews performing individual tasks. DOI 10.5592/otmcj.2015.2.6 Research paper

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Time Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry

This paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. The output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (LLNF) model, is useful for assessing a project status at different time horizons. Being trained by a locally linear model tree (LOLIMOT) learning algorithm, the model is int...

متن کامل

Change Management and Change Process Model for the Iranian Construction Industry

Changes are inevitable in construction projects. They could lead to disruptive impacts on the quality, schedule and budget of projects. Identifying changes and anticipating their consequences can help project teams mitigate these negative impacts. As a result, a change process model has been defined to improve this procedure. At first the present paper the defines some of the key terms in this ...

متن کامل

Using Markov Chain to Analyze Production Lines Systems with Layout Constraints

There are some problems with estimating the time required for the manufacturing process of products, especially when there is a variable serving time, like control stage. These problems will cause overestimation of process time. Layout constraints, reworking constraints and inflexible product schedule in multi product lines need a precise planning to reduce volume in particular situation of lin...

متن کامل

Predicting the Percentage of Sway Index from the Static Balance Based on the Anthropometric Dimensions of Construction Workers

Introduction: The purpose of the current study was to predict the percentage of the sway index from the static balance point based on the anthropometric dimensions of construction workers. Material and Methods: This descriptive-analytical study was conducted on 114 construction workers. First, the construction workers were asked to complete the demographic questionnaire and the inclusion crite...

متن کامل

Earthen architecture, an alternative to construction industry to manage the drought crisis in Iran: Comparison between water usage in a building with three type of loading system: steel, concrete, and earth

Abstract: Iran faces water shortage crisis whilst construction industry consumes huge amount of water. There are not precise data about construction industry water consumption. Accordingly, lack of comparison as well as prioritization between prevalent structural systems and alternatives which probably use less water create problems in planning for less consumption. There are two questions whi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015