Development of a Multi-agent Simulator of Electric Power Distribution Equipment Damage Restoration Process

نویسندگان

  • Shigeo Sagai
  • Yoshiharu Shumuta
  • Toshikatsu Mori
چکیده

We propose a multi-agent simulator of an electric power distribution equipment damage restoration process due to a disaster. In the proposed simulator, the agents, who imitate the restorer, are modeled by extracting main work steps of the actual restoration process. The major functions of the proposed simulator are 1) to imitate the restoration process, 2) to estimate the alternative strategy, and 3) to improve the restoration time estimation by adding the damage information reported by the inspector. In this paper, we show an outline of the prototype and demonstrate numerical examples to confirm the effectiveness.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Finding the Optimal Path to Restoration Loads of Power Distribution Network by Hybrid GA-BCO Algorithms Under Fault and Fuzzy Objective Functions with Load Variations

In this paper proposes a fuzzy multi-objective hybrid Genetic and Bee colony optimization algorithm(GA-BCO) to find the optimal restoration of loads of power distribution network under fault.Restoration of distribution systems is a complex combinatorial optimization problem that should beefficiently restored in reasonable time. To improve the efficiency of restoration and facilitate theactivity...

متن کامل

Application of Multi Agent System

This paper deals with the application of a multi agent system (MAS) for service restoration in distributed power systems. In this paper, the part of the service restoration process which deals with restoring power to consumers in case of an outage, is considered. A restoration strategy based on agent technology has been formulated. This strategy proposes a method for prioritizing certain consum...

متن کامل

An Operational Planning Approach Distribution Automation Considering the Contribution of Demand Response Programs in Service Restoration Process

This paper proposes an advanced distribution automation planning problem in which emergency-based demand response plans are incorporated during service restoration process. The fitness function of this planning problem consists of various costs associated with fault occurrence in electric distribution systems consisting of the total yearly cost of customers’ interruptions, the total annualized ...

متن کامل

Multi-Agent System for Automated Service Restoration of Shipboard Power Systems

Faults in a Shipboard Power System (SPS) may occur due to material casualties of electrical components or widespread fault due to battle damage. These faults may interrupt supply of electrical energy to loads that are important for proper functioning and survivability of SPS. To improve the reliability of SPS, and thus to enhance survivability of naval ships, automatic service restoration is pe...

متن کامل

Multi-agent Based Formalization of Electric Power Distribution System Design Process

This paper is concerned with the conceptual basis of multi-agent based formalization of the process of electric power distribution system design. A choice of a multi-agent software architecture is made, the interface protocols and approaches to the coordination of intellectual agents are described. Based on the ontological approach, a multi-aspect information model of electric power distributio...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008