Structural Exploration of Constraint-Based Scheduling Problems
نویسندگان
چکیده
Constraint-based scheduling (CBS) is a highly efficient and widely applied method in solving resourceconstrained project scheduling problems – including job-shop scheduling problems. However, many recent studies suggest that practical problems highly differ from benchmark instances used in theoretical scheduling research, generated intentionally to challenge solvers. Although industrial problems require a rich and large-size model, they are simple in the sense that they often have a loosely connected structure of easy and hard subproblems. In this paper, we present how we extended a general CBS framework by methods that exploit these structural properties. Our system was validated on industrial job-shop scheduling problem instances containing up to 2000 tasks, and succeeded in solving problem instances that previously remained unsolvable due to their sheer size.
منابع مشابه
Train Scheduling Problem with Consideration of Praying Constraint as an Application of Job Shop Scheduling Problem
The present paper extends the idea of job shop scheduling problem with resting constraints to the train scheduling problem with the Muslim praying considerations. For this purpose, after proposing the new mathematical model, a heuristic algorithm based on the Electromagnetism-Like algorithm (EM) which is well adjusted to scheduling problems is employed to solve the large-size practical cases. T...
متن کاملThree Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint
Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...
متن کاملA Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint
In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, thi...
متن کاملStudy of Scheduling Problems with Machine Availability Constraint
In real world scheduling applications, machines might not be available during certain time periods due to deterministic or stochastic causes. In this article, the machine scheduling with availability constraints for both deterministic and stochastic cases with different environments, constraints and performance measures will be discussed. The existing body of research work in the literature wil...
متن کاملThe resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study
Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...
متن کامل