A Genetic Algorithm for Lot-Streaming

نویسندگان

  • Suk-Hun Yoon
  • José A. Ventura
چکیده

A hybrid genetic algorithm (HGA) approach is proposed for a lot-streaming flow shop scheduling problem, in which a job (lot) is split into a number of smaller sublots so that successive operations can be overlapped. The objective is the minimization of the mean weighted absolute deviation of job completion t imes from due dates.

منابع مشابه

Hybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage

In this paper, a Job shop scheduling problem with a parallel assembly stage and Lot Streaming (LS) is considered for the first time in both machining and assembly stages. Lot Streaming technique is a process of splitting jobs into smaller sub-jobs such that successive operations can be overlapped. Hence, to solve job shop scheduling problem with a parallel assembly stage and lot streaming, deci...

متن کامل

Modelling and Scheduling Lot Streaming Flexible Flow Lines

Although lot streaming scheduling is an active research field, lot streaming flexible flow lines problems have received far less attention than classical flow shops. This paper deals with scheduling jobs in lot streaming flexible flow line problems. The paper mathematically formulates the problem by a mixed integer linear programming model. This model solves small instances to optimality. Moreo...

متن کامل

Customer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop

This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...

متن کامل

Critical Path Method for Flexible Job Shop Scheduling Problem with Preemption

This paper addressed a Flexible Job shop Scheduling Problem (FJSP) with the objective of minimization of maximum completion time (Cmax) which job splitting or lot streaming is allowed. Lot streaming is an important technique that has been used widely to reduce completion time of a production system. Due to the complexity of the problem; exact optimization techniques such as branch and bound alg...

متن کامل

Lot Streaming in No-wait Multi Product Flowshop Considering Sequence Dependent Setup Times and Position Based Learning Factors

This paper considers a no-wait multi product flowshop scheduling problem with sequence dependent setup times. Lot streaming divide the lots of products into portions called sublots in order to reduce the lead times and work-in-process, and increase the machine utilization rates. The objective is to minimize the makespan. To clarify the system, mathematical model of the problem is presented. Sin...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

متن کامل
عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002