Co-operative Reactive Scheduling: Schedule Execution using Perturbation Analysis
نویسندگان
چکیده
Resource allocation for manufacturing systems (including scheduling, reactive scheduling, and control of discrete event systems) is a typical non-linear dynamic system, often at the edge of chaos. In previous work, we developed an architecture for resource allocation where a reactive scheduler co-operates with an autonomous on-line shop floor control (SFC) system to combine high performance with reactivity and robustness against disturbances. The on-line SFC system has to react to disturbances, while following the existing schedule as good as possible. This “schedule execution” problem is not trivial, because the decisions taken by the on-line SFC system are local decisions, that affect the global performance in a
منابع مشابه
Schedule Execution Using Perturbation Analysis
In a holonic shop floor control (SFC) architecture, a reactive scheduler co-operates with an autonomous on-line SFC system to combine high performance with reactivity against disturbances. To take its decisions, the on-line SFC system uses the existing schedule as advice. This “schedule execution” problem (SE) is not trivial, because the decisions taken by the on-line SFC system are local decis...
متن کاملReactive Scheduling in Holonic Manufacturing Systems: Architecture, Dynamic Model and Co-operation Strategy Proceedings of ASI 97 (Advanced Summer Institute of the Network of Excellence on Intelligent Control and Integrated Manufacturing
This paper presents an architecture for reactive scheduling that enables concurrent scheduling and schedule execution. When disturbances occur, the system reacts to them at several levels: an on-line shop floor control system reacts immediately, and the reactive scheduler responds more slowly, but with a higher response time. This approach enables a good combination of performance optimisation ...
متن کاملExecution Monitoring and Schedule Revision for O-OSCAR: a Preliminary Report
This paper addresses the problem of maintaining the consistency of a pre-defined schedule during its execution in a real or simulated environment. This issue, referred to as Reactive Scheduling Problem, is known to be inherently difficult due to the usually strict timelines in which the revising procedure is called to react. Schedule revision must be quick, and sometimes solution quality must c...
متن کاملAnalysis of a Benchmark Generator for the Reactive Scheduling Problem
This paper performs an analysis aiming at the production of a benchmark generator for Reactive Scheduling problem instances. The problem of monitoring the execution of a schedule and repairing it every time it is deemed necessary because of the action of unexpected exogenous events, is a rather hot topic in the research community; even more so, since the industry is increasingly becoming aware ...
متن کاملUncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...
متن کامل