Anticipatory algorithms for online stochastic optimization have been shown very effective in a variety of areas, including logistics, reservation systems, and scheduling. For such applications which typically feature purely exogenous uncertainty, the one-step anticipatory algorithm was shown theoretically to be close to optimal when the stochasticity of the problem, measured by the anticipatory gap, is small. This paper studies the behavior of one-step anticipatory algorithms on applications in which the uncertainty is exogenous but the observations are endogenous. It shows that one-step anticipatory algorithms exhibit a much larger anticipatory gap and proposes a number of gap-reduction techniques to address this limitation. The resulting one-step anticipatory algorithms are shown to outperform significantly the state-of-the-art dynamic-programming approach on an online stochastic resource-constrained project scheduling application.
منابع مشابه
A stochastic model for project selection and scheduling problem
Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...
متن کاملUncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...
متن کاملSplittable stochastic project scheduling with constrained renewable resource
This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...
متن کاملA New Technique for Estimating the Distribution of a Stochastic Project Makespan
A critical success dimension in projects is the ability to complete a project within an estimated duration. In that regard, effective project scheduling techniques in an uncertain environment is of interest in many organizations. In this paper, the authors use an analytic approach to analyze the behavior of time duration distributions of projects in stochastic activity networks, and propose a s...
متن کاملOptimization of the Microgrid Scheduling with Considering Contingencies in an Uncertainty Environment
In this paper, a stochastic two-stage model is offered for optimization of the day-ahead scheduling of the microgrid. System uncertainties including dispatchable distributed generation and energy storage contingencies are considered in the stochastic model. For handling uncertainties, Monte Carlo simulation is employed for generation several scenarios and then a reduction method is used to decr...