Remote control of HV stations and MV substations in Milan
نویسنده
چکیده
Aem Elettricità SpA Aem Elettricità is part of Aem Group, a former multi-service power utility located in Milan, Italy. Following the market evolution, Aem Group is undergoing a period of deep changes, too. The major one derive from the achievement of the city distribution network previously owned by ENEL. Indeed, AEM and ENEL have shared the distribution in Milan since 1962. Now, according to the deregulation laws, the local companies must become the only city power company.
منابع مشابه
Teaching reliability analysis of HV/MV substations and distribution feeders using educational software
In this paper, educational software for the reliability assessment of high/medium-voltage (HV/MV) substations and distribution feeders is presented. It is a useful tool for learning the utility of reliability indices of the HV/MV substations and their distribution feeders, and their influence on the electrical power system operation. By means of an interactive graphical interface, multiple conf...
متن کاملOptimal Placement of Substations Based on Economic and Technical Risk Management
Design and expansion of distribution systems seems inevitable in view of the need to satisfy the rise in energy consumption in a technical and economical way. Optimal location, sizing and determining the service area of substations is one of the principle problems in expansion of distribution systems. Also uncertainty is one of the important factors that increase risk of exact decision makings....
متن کاملMulti-objective Dynamic Planning of Substations and Primary Feeders Considering Uncertainties and Reliability
This research uses a comprehensive method to solve a combinatorial problem of distribution network expansion planning (DNEP) problem. The proposed multi-objective scheme aims to improve power system's accountability and system performance parameters, simultaneously, in the lowest possible costs. The dynamic programming approach is implemented in order to find the optimal sizing, siting and timi...
متن کاملActive length of cable lines with uncoated metal sheaths as long grounding conductors
Power cables that have sheaths, usually lead, and are manufactured with bitumen impregnated hessian which degrades over time, act as long grounding electrodes or inject fault current directly into the surrounding soil. As a consequence of this, the MV lines made of this type of cable spontaneously form a very large and complex grounding system around the high-voltage/medium-voltage (HV/MV) dist...
متن کاملOptimal Design of Grounding System for HV/ EHV Substations in Two Layered Soil
Successful operation of entire power system depends to a considerable extent on efficient and satisfactory performance of substations. Hence substations in general can be considered as heart of overall power system. In any substation, a well designed grounding plays an important role. Since absence of safe and effective grounding system can result in mal-operation or non-operation of control an...
متن کامل