In this paper we study an extension of the single machine scheduling problem with the total weighted completion time objective, where there is a single non-renewable resource consumed by the jobs, having an initial stock and some additional replenishments over time. We prove that this problem is NP-hard in the strong sense, and provide an FPTAS for a special case with two supply dates.
منابع مشابه
NP-hardness of the single-variable-resource scheduling problem to minimize the total weighted completion time
Baker and Nuttle [1] studied the following single-variable-resource scheduling problem: sequencing n jobs for processing by a single resource to minimize a function of job completion times, when the availability of the resource varies over time. When the objective function to be minimized is the total weighted completion time, Baker and Nuttle conjectured that the problem is NP-hard. We show in...
متن کاملAn Iterated Greedy Algorithm for Flexible Flow Lines with Sequence Dependent Setup Times to Minimize Total Weighted Completion Time
This paper explores the flexile flow lines where setup times are sequence- dependent. The optimization criterion is the minimization of total weighted completion time. We propose an iterated greedy algorithm (IGA) to tackle the problem. An experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of IGA are compared against those of some other exist...
متن کاملApproximability of scheduling problems with resource consuming jobs
The paper presents new approximability results for single machine scheduling problems with jobs requiring some non-renewable resources (like raw materials, energy, or money) beside the machine. Each resource has an initial stock and additional supplies over time. A feasible schedule specifies a starting time for each job such that no two jobs overlap in time, and when a job is started, enough r...
متن کاملApproximability of Average Completion Time Scheduling on Unrelated Machines
We show that minimizing the average job completion time on unrelated machines isAPX -hard if preemption of jobs is allowed. This provides one of the last missing pieces in the complexity classification of machine scheduling with (weighted) sum of completion times objective. The proof is based on a mixed integer linear program. This means that verification of the reduction is partly done by an I...
متن کاملApproximation schemes for minimizing total (weighted) completion time with release dates on a batch machine
A batch machine is a machine that can process a number of jobs simultaneously as a batch, and the processing time of a batch is equal to the longest processing time of the jobs assigned to it. In this paper we present a polynomial time approximation scheme (PTAS) for scheduling a batch machine to minimize the total completion time with job release dates. Also, we present a fully polynomial time...