A Comparison Study between the CUDD and
نویسنده
چکیده
منابع مشابه
An Improved Algorithm for Network Reliability Evaluation
Binary Decision Diagram (BDD) is a data structure proved to be compact in representation and efficient in manipulation of Boolean formulas. Using Binary decision diagram in network reliability analysis has already been investigated by some researchers. In this paper we show how an exact algorithm for network reliability can be improved and implemented efficiently by using CUDD - Colorado Univer...
متن کاملAn Introduction to Zero-Suppressed Binary Decision Diagrams
Zero-suppressed binary Decision Diagrams (ZDDs) have emerged as an efficient way of solving problems in set theory. This tutorial presents ZDDs and assumes that the reader is familiar with Boolean algebra and Binary Decision Diagrams, without prior knowledge of ZDDs. The case studies include the computation of the union of two sets, the generation of all primes of a Boolean function, and the co...
متن کاملReliable and Efficient Distribution of Multicast Session Key for Deduplicated Data in Cloud Computing
Data deduplication is one of the fascinating features of any cloud computing storage service which is generally realized as Cross User Data Deduplication (CUDD). Although it provides optimization which is challenging to achieve due to security concerns. A User always concerns about privacy and confidentiality of the data from honest but curious insiders. Encryption introduces new challenge like...
متن کاملSpace- and Time-Efficient BDD Construction via Working Set Control
Binary decision diagrams (BDDs) have been shown to be a powerful tool in formal verification. Efficient BDD construction techniques become more important as the complexity of protocol and circuit designs increases. This paper addresses this issue by introducing three techniques based on working set control. First, we introduce a novel BDD construction algorithm based on partial breadth-first ex...
متن کاملa Comparison Study Between the Joint Probability Approach and Time Series Rainfall Modelling in Coastal Detention Pond Analysis (RESEARCH NOTE)
In tidally affected coastal catchments detention pond should be provided to store flood surface water. A comparison between the full simulation approach based on the joint probability method and time series rainfall modeling via the annual maximum of pond level was undertaken to investigate the assumptions of independence between variables that are necessary in the joint probability method. The...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2002