Fuzzy Scheduling of Repetitive Construction Projects

نویسندگان

  • O. Moselhi
  • T. Zayed
چکیده

Uncertainty is an inherent characteristic of construction projects. Neglecting uncertainties associated with different input parameters in the planning stage could well lead to misleading and/or unachievable project schedules. The objective of this paper is to present a new approach towards scheduling repetitive construction projects while accounting for uncertainty. The paper presents an algorithm that quantifies anticipated delays resulting from different sources of uncertainty in the form of fuzzy time buffers. Through inserting the time buffers in strategic places in a time schedule, the algorithm provides protection against those main anticipated delays. The presented algorithm comprises two integrated components, a scheduling component responsible for producing a basic Linear Scheduling Method (LSM) schedule with deterministic activity durations, and a buffer component that handles fuzzy buffers sizing and insertion. The presented algorithm offers four different buffer insertion techniques covering different cases of interrelations between successive activities. The algorithm is implemented in a spreadsheet application, which automates calculations, yet allows users to fine tune the algorithm to fit the project at hand. With a focuses on highway construction projects as an example of repetitive construction projects, this paper accounts for sources of uncertainty such as weather, site conditions, change orders and equipment related delays. A hypothetical case is studied and explained to further demonstrate how the proposed algorithm works.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

DEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY

Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...

متن کامل

Scheduling Repetitive Construction Projects Using Fuzzy Linear Programming

Scheduling problem for repetitive construction projects involves three conflicting objectives. These objectives are project duration, project total cost, and project total interruption time. This paper presents a multi-objective fuzzy linear programming model (FLP) for resolving this problem. Literature concerned with scheduling problems for repetitive construction projects was reviewed. Multi-...

متن کامل

A Model for Automated Generation of Resource-driven Construction Schedule for Housing Industry

The efficacy of managing a construction project mainly depends on proper planning and scheduling. Mass housing projects are highly repetitive in nature, as the methods used for construction are often repetitive or cyclic. Resources are therefore being deployed repeatedly for the similar or identical tasks in these projects. In order to eradicate delays in mobilizing resources, an efficient reso...

متن کامل

A MULTI-OBJECTIVE DECENTRALIZED MULTIPLE CONSTRUCTION PROJECTS SCHEDULING PROBLEM CONSIDERING PERIODIC SERVICES AND ORDERING POLICIES

In decentralized construction projects, costs are mostly related to investment, material, holding, logistics, and other minor costs for implementation. For this reason, simultaneous planning of these items and appropriate scheduling of activities can significantly reduce the total costs of the project undertaken. This paper investigates the decentralized multiple construction projects schedulin...

متن کامل

Resource-driven Scheduling for Repetitive Projects: a Pull-system Approach

Having resources work continuously has long been the goal for scheduling repetitive projects. Waste (unforced idleness) in repetitive projects is observed when labor and equipment (resources) are waiting, being idle, because the preceding resources have not finished their jobs. In this paper we investigate the existence and influence of unforced idleness. In contrast to the push-system approach...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013