The ultimate bluff: a case study of partygaming.com

نویسنده

  • Des Laffey
چکیده

June 2005 was to bring online gambling out of the shadows and into the spotlight. PartyGaming, a start-up formed in 1997, launched a flotation (Initial Public Offering) on the London Stock Exchange that valued the firm at d4.64 billion giving it a larger market capitalisation than British Airways. PartyGaming had become the dominant player in the booming online poker market with its PartyPoker brand having over 50% market share. However, this float – as with Internet gambling in general – was not without controversy. While PartyGaming had an online gambling license from the tax haven of Gibraltar, nearly 90% of its revenue came from the United States, where the authorities viewed Internet gambling as illegal and threatened legal action. The complex operations of this truly global firm with bases in London, India, Gibraltar and Canada, the background of its founder Ruth Parasol in Internet pornography and the handling of its flotation also raised concerns from an ethical perspective, with some commentators questioning whether the float should have been allowed at all. These concerns were then confirmed as US legislation to curb online gambling was passed in September 2006, leading to PartyGaming’s exit from the US market and an immediate fall of 58% in the share price. This case study analyses the entrepreneurs behind PartyGaming, its growth, the challenges it has faced, the ethical issues it poses and its future prospects. The case draws on theory from e-commerce, strategy and ethics. Journal of Information Technology (2007) 22, 479–488. doi:10.1057/palgrave.jit.2000096 Published online 10 April 2007

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Acceleration of Bluff Body Calculation Using Mdgrape-2

Bluff body calculation was accelerated by using a special-purpose computer, MDGRAPE-2, that was exclusively designed for molecular dynamics simulations. The three main issues were solved regarding the implementation of the MDGRAPE-2 on vortex methods. These issues were the efficient calculation of the Biot-Savart and stretching equation, the optimization of the table domain, and the round-off e...

متن کامل

A Review of Recent Studies on Simulations for Flow around High-Speed Trains

Fluid flow around bluff bodies occurs in numerous fields of science and engineering, such as flows pass vehicles, cables, towers and bridges. These flows have been studied experimentally and numerically for the last several decades. The investigation of flow around high-speed trains is an important application of bluff bodies. Fluid flow, aerodynamic forces and moments, separation and wake regi...

متن کامل

Numerical Simulation of the Incompressible Laminar Flow Over a Square Cylinder

Simulation of fluid flow over a square cylinder can be performed in order to understand the physics of the flow over bluff bodies. In the current study, incompressible laminar flow over a confined square cylinder, with variable blockage factor has been simulated numerically, using computational fluid dynamics (CFD). The focus has been on vortex-induced vibration (VIV) of the cylinder. Vorticity...

متن کامل

Parametric investigation of autofrettage process in thick spherical vessel made of functionally graded materials

In this paper, the effect of autofrettage process parameters on the ultimate pressure that functionally graded spherical vessel can tolerate are investigated. FGM properties and autofrettage pressure are considered as important parameters. Assumptions are variation of properties of FGM in radial direction, the residual stress in the absence of Bauschinger effect with the operation of variable m...

متن کامل

Determination of Ultimate Pit Limits in Open Mines Using Real Option Approach

Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the metal price. Metal price fluctuations in recent years were exaggerated and impose...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • JIT

دوره 22  شماره 

صفحات  -

تاریخ انتشار 2007