Ac 2007-419: Laboratory Learning of the Benefits Arising from Detailed Pre-planning of Construction Operations
نویسندگان
چکیده
Construction operations can be categorized as either routine and repetitive or unique and complex. The means of developing an understanding of operations in each category differs. An understanding of routine and repetitive operations is best developed through analysis of field operations. Unique and complex operations by their very nature have not been constructed in the field. Therefore, an understanding of such operations can be developed through a pre-planning process of first “building on paper.” A laboratory session was incorporated into a construction means and methods course to demonstrate the benefits of pre-planning construction operations. Students used the K’NEX construction system to build a replica of the Tower Bridge. By design, some groups pre-planned their operations, while others did not. The value of pre-planning was evident through observation of their performance.
منابع مشابه
Planning Time: A Mediating Technique between Fluency and Accuracy in Task-Based Teaching
Task-based instruction is arguably associated with fostering fluent L2 speech distant from native-like accuracy. Of several methodological options recommended for accounting for accuracy problems of meaning-first approaches to language teaching, planning time has been explored in this study. Three groups of English majors watched a cartoon and narrated their accounts of watching under no-planni...
متن کاملA Comprehensive Mathematical Model for the Design of a Dynamic Cellular Manufacturing System Integrated with Production Planning and Several Manufacturing Attributes
Dynamic cellular manufacturing systems, Mixed-integer non-linear programming, Production planning, Manufacturing attributes This paper presents a novel mixed-integer non-linear programming model for the design of a dynamic cellular manufacturing system (DCMS) based on production planning (PP) decisions and several manufacturing attributes. Such an integrated DCMS model with an extensi...
متن کاملPre-positioning and dynamic operations planning in pre- and post-disaster phases with lateral transhipment under uncertainty and disruption
Humanitarian organizations pre-position relief items in pre-disaster and distribute them to the affected areas in post-disaster. Improper planning of emergency operations causes more deaths in post-disaster. In this paper, the problem of relief item pre-positioning and multi-period distribution planning is addressed considering lateral transhipment among distribution centres to improve the effi...
متن کاملAc 2007-2824: the Innovative Development of Sustainable Technologies in Undergraduate Programs: Case Study ? Bio-diesel Project
Sustainable principles and the so-called “green” technologies apply to all building systems from planning to design and from construction to operations and deconstruction. The construction industry has recently realized the necessity of having their engineers to get acquainted with green building practices. In this paper, a project has been developed and is aimed at developing two pedagogical m...
متن کاملAn integrated simulation-DEA approach to multi-criteria ranking of scenarios for execution of operations in a construction project
The purpose of this study is to examine different scenarios for implementing operations in the pre-construction phase of a project, based on several competing criteria with different importance levels in order to achieve a more efficient execution plan. This paper presents a new framework that integrates discrete event simulation (DES) and data envelopment analysis (DEA) to rank different scena...
متن کامل