Minimization of the Mean Absolute Deviation from a Common Due Date in a Two-machine Flowshop

نویسندگان

  • Débora P. Ronconi
  • Celso S. Sakuraba
  • Francis Sourd
چکیده

This paper addresses the minimization of the mean absolute deviation from a common due date in a two-machine flowshop scheduling problem. Initially, a job scheduling algorithm that obtains an optimal schedule for a given job sequence is presented. This algorithm is used with a job insertion procedure to generate a group of heuristics that differ on the initial job sequencing rule. Computational experiments show that the developed heuristics outperform results found in the literature for problems up to 500 jobs.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An approximation algorithm and FPTAS for Tardy/Lost minimization with common due dates on a single machine

This paper addresses the Tardy/Lost penalty minimization with common due dates on a single machine. According to this performance measure, if the tardiness of a job exceeds a predefined value, the job will be lost and penalized by a fixed value. Initially, we present a 2-approximation algorithm and examine its worst case ratio bound. Then, a pseudo-polynomial dynamic programming algorithm is de...

متن کامل

Development of a Set of Algorithms for the Multi-Project Scheduling Problems

In this paper, the problem of determining the best schedule for a set of projects has been modeled in the form of a generalized tardiness flowshop (GTF) problem. We develop a set of heuristic algorithms for minimizing the total tardiness of jobs in a GTF problem. In the generalized version of tardiness flowshop problems, a job is considered to be a collection of operations and there is a due da...

متن کامل

Minimizing Total Weighted Tardiness with Drop Dead Dates in Single Machine Scheduling Problem

  This paper deals with minimization of tardiness in single machine scheduling problem when each job has two different due-dates i.e. ordinary due-date and drop dead date. The drop dead date is the date in which jobs’ weights rise sharply or the customer cancels the order. A linear programming formulation is developed for the problem and since the problem is known to be NP-hard, three heuristic...

متن کامل

Particle swarm optimization for minimizing total earliness/tardiness costs of two-stage assembly flowshop scheduling problem in a batched delivery system

This paper considers a two-stage assembly flow shop scheduling problem. When all parts of each product are completed in the first stage, they are assembled into a final product on an assembly machine in the second stage. In order to reduce the delivery cost, completed products can be held until completion of some other products to be delivered in a same batch. The proposed problem addresses sch...

متن کامل

Minimizing Total Weighted Tardiness in a Flexible Flowshop Environment Considering Batch Processing Machines

Scheduling in production environments is used as a competitive tool to improve efficiency and respond to customer requests. In this paper, a scheduling problem is investigated in a three-stage flexible flowshop environment with the consideration of blocking and batch processing. This problem has been inspired by the charging and packaging line of a large battery manufacturer. In this environmen...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007