Analysis of external and internal risks in project early phase
نویسنده
چکیده
During the early “conceptual” phase of a project life-cycle – considering for instance a competitive bidding process when a request for bidding has been received by an engineering & contracting company and the decision to bid has been made – the main objective of the proposal manager is to achieve an effective trade-off between the bid competitive value on the side of the client expectations and the project baseline in term of time/ cost / performance constraints on the side of the utilisation of the internal resources. Since project final performance depends primarily on risk analysis and management, a “risk driven approach” to Project Management appears to be necessary, particularly during the project early phase when only scarce information is available and contractual obligations are to be taken. In this context, both “internal” risk (e.g. probability of cost overrun) and “external” risk (e.g. probability of winning) must be taken into account. The paper presents the PRIMA (Project RIsk Management IST-1999-10193) research project aiming at implementing such a “risk driven approach” to Project Management through the development of a Risk Management Corporate Memory and a Decision Support System allowing for collecting, storing, sharing, using company knowledge both in terms of data records and experts knowledge in order to improve the company capability of project risk analysis and management.
منابع مشابه
A COMPARATIVE MODEL OF EVM AND PROJECT’S SCHEDULE RISK ANALYSIS USING MONTE CARLO SIMULATION
<span style="color: #000000; font-family: Tahoma, sans-serif; font-size: 13px; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: auto; text-align: justify; text-indent: 0px; text-transform: none; white-space: normal; widows: auto; word-spacing: 0px; -webkit-text-stroke-width: 0px; display: inline !important; float: none; backgro...
متن کاملA COMPARATIVE MODEL OF EVM AND PROJECT’S SCHEDULE RISK ANALYSIS USING MONTE CARLO SIMULATION
<span style="color: #000000; font-family: Tahoma, sans-serif; font-size: 13px; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: auto; text-align: justify; text-indent: 0px; text-transform: none; white-space: normal; widows: auto; word-spacing: 0px; -webkit-text-stroke-width: 0px; display: inline !important; float: none; backgro...
متن کاملDeveloping an Integrated Simulation Model of Bayesian-networks to Estimate the Completion Cost of a Project under Risk: Case Study on Phase 13 of South Pars Gas Field Development Projects
Objective: The aim of this paper is to propose a new approach to assess the aggregated impact of risks on the completion cost of a construction project. Such an aggregated impact includes the main impacts of risks as well as the impacts of interactions caused by dependencies among them. Methods: In this study, Monte Carlo simulation and Bayesian Networks methods are combined to present a frame...
متن کاملPrioritization of Supply Chain Risks in Automotive Industry
Supply chains are constantly exposed to various risks. An incident or uncertain event, which has positive or negative effect on the objectives of a project, is called a risk. According to this identification, analysis and prioritization of risks may have a significant role in the success of the project. The purpose of risk management is to reduce the risks of non-achievement of these object...
متن کاملPrioritization of Supply Chain Risks in Automotive Industry
Supply chains are constantly exposed to various risks. An incident or uncertain event, which has positive or negative effect on the objectives of a project, is called a risk. According to this identification, analysis and prioritization of risks may have a significant role in the success of the project. The purpose of risk management is to reduce the risks of non-achievement of these object...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2000