Robust Scheduling of Crude Oil Operations under Demand and Ship Arrival Uncertainty

نویسندگان

  • J. Li
  • I. A. Karimi
  • R. Srinivasan
چکیده

Scheduling of crude oil operations is an important and complex routine task in a refinery. It involves crude oil unloading, tank allocation, storage and blending of crudes, and CDU charging. Optimal crude oil scheduling can increase profits by exploiting cheaper but poor quality crudes, minimizing crude changeovers, avoiding ship demurrage, and managing crude inventory optimally. In our previous work (Li et al. 2005), we have developed robust algorithms for obtaining optimal schedules for operations without any uncertainty. However, in a practice, uncertainties are unavoidable. Some common and frequent uncertainties in refinery operations include ship arrival delays, demand fluctuations, equipment malfunction, etc. In the face of these uncertainties, an optimal schedule obtained using nominal parameter values may often be suboptimal or even become infeasible. Thus, it is critical to develop algorithms that can consider future uncertainty at the scheduling stage to improve schedule feasibility and robustness. So far, scheduling and planning under uncertainty has been studied in specific fields such as capacity expansion, production planning, batch plant scheduling, etc. Demand and processing time uncertainties have been the focus of most existing work in the batch area. However, little work exists on refinery planning and scheduling under uncertainty. Arief et al. (2004) proposed a heuristic approach to reschedule operations of a given schedule to accommodate disruptions. Neiro and Pinto (2005) proposed a production-planning model incorporating product price and demand uncertainties in a refinery. Li et al. (2004) addressed the problem of refinery planning under demand or other economic parameters uncertainties with two-stage stochastic programming approach. Li et al. (2005) developed a planning model for refinery under correlated and truncated price and demand uncertainties. However, no work has so far addressed the development of robust schedules for crude oil scheduling in the face of uncertainties. Therefore, in this paper, we modify the deterministic MILP approach of Reddy et al. (2004b) to address two important uncertainties in crude operations, namely product demand and ship arrival uncertainties and develop some strategies to obtain robust schedules.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling Post-Distribution Cross-Dock under Demand Uncertainty

The system of distribution of goods and services, along with other economic developments around the world, is rapidly evolving. In the world of distribution of goods, the main focus is on making distribution operations more effective. Due to the fact that the cross-dock has the advantage of removing intermediaries and reducing the space required for the warehouse, it is worth considering. Among...

متن کامل

Effect of Ship Fuel Sulfur Reduction Law on Iranian Oil Price (IMO Law)

In recent decades, the increase of pollution from consumption of oil and petroleum products has led to development of many environmental laws. It is important for Iranian policy makers to be informed about the impact of such laws on oil prices, given the dependence of the country’s budget on oil revenues. Under a new International Maritime Organization regulation passed in mid-2016, ships are r...

متن کامل

An Approximation Solution to Refinery Crude Oil Scheduling Problem with Demand Uncertainty Using Joint Constrained Programming

This paper is devoted to develop an approximation method for scheduling refinery crude oil operations by taking into consideration the demand uncertainty. In the stochastic model the demand uncertainty is modeled as random variables which follow a joint multivariate distribution with a specific correlation structure. Compared to deterministic models in existing works, the stochastic model can b...

متن کامل

Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach

Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...

متن کامل

A Robust Programming Approach to Bi-objective Optimization Model in the Disaster Relief Logistics Response Phase

Accidents and natural disasters and crises coming out of them indicate the importance of an integrated planning to reduce their effected. Therefore, disaster relief logistics is one of the main activities in disaster management. In this paper, we study the response phase of the disaster management cycle and a bi-objective model has been developed for relief chain logistic in uncertainty conditi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006