An Integrated Simulation And Optimization Approach For Seaside Terminal Operations
نویسندگان
چکیده
In this paper we focus our attention on the operational decision problems related to the seaside area of maritime container terminals. In particular, we face the Quay Crane Assignment Problem (QCAP) and Quay Crane Scheduling Problem (QCSP) with an integrated simulation-optimization approach. A 0/1 MIP model is developed in order to determine the optimal assignment, on a shift basis, of QCs to bays of each ship served by the terminal during a given planning horizon, referred as Bay_QCAP. The optimization model solutions are used as input parameters for a Discrete Event Simulation (DES) model able to reproduce the system behaviour taking into account its stochastic nature and complexity. The framework can be used for evaluating the impact on the seaside terminal performance of the optimized solutions and the effects of different operative decisions related to the scheduling of QCs. The framework is going to be applied to a real case study pertaining to the Southern European Container Hub (SECH), sited in the Port of Genoa, Italy.
منابع مشابه
A New Approach for Sequencing Loading and Unloading Operations in the Seaside Area of a Container Terminal
Due to the considerable growth in the worldwide container transportation, optimization of container terminal operations is becoming highly needed to rationalize the use of logistics resources. For this reason, we focus our study on the Quay Crane Scheduling Problem (QCSP), which is a core task of managing maritime container terminals. From this planning problem arise two decisions to be made: T...
متن کاملAn integrated simulation-DEA approach to multi-criteria ranking of scenarios for execution of operations in a construction project
The purpose of this study is to examine different scenarios for implementing operations in the pre-construction phase of a project, based on several competing criteria with different importance levels in order to achieve a more efficient execution plan. This paper presents a new framework that integrates discrete event simulation (DES) and data envelopment analysis (DEA) to rank different scena...
متن کاملExact Mixed Integer Programming for Integrated Scheduling and Process Planning in Flexible Environment
This paper presented a mixed integer programming for integrated scheduling and process planning. The presented process plan included some orders with precedence relations similar to Multiple Traveling Salesman Problem (MTSP), which was categorized as an NP-hard problem. These types of problems are also called advanced planning because of simultaneously determining the appropriate sequence and m...
متن کاملRELIABILITY–BASED DESIGN OPTIMIZATION OF CONCRETE GRAVITY DAMS USING SUBSET SIMULATION
The paper deals with the reliability–based design optimization (RBDO) of concrete gravity dams subjected to earthquake load using subset simulation. The optimization problem is formulated such that the optimal shape of concrete gravity dam described by a number of variables is found by minimizing the total cost of concrete gravity dam for the given target reliability. In order to achieve this p...
متن کاملIntegrated Well Placement and Completion Optimization using Heuristic Algorithms: A Case Study of an Iranian Carbonate Formation
Determination of optimum location for drilling a new well not only requires engineering judgments but also consumes excessive computational time. Additionally, availability of many physical constraints such as the well length, trajectory, and completion type and the numerous affecting parameters including, well type, well numbers, well-control variables prompt that the optimization approaches b...
متن کامل