Development of Comprehensive Monitoring and Control System for Power Plants

نویسندگان

  • Yoshio Maruyama
  • Katsuhide Kitagawa
  • Kazuhiko Miura
  • Yoshiyuki Tanaka
  • Takahiro Yamada
چکیده

INTRODUCTION THE bulk of the Japanese market for monitoring and control systems for thermal and hydro power plants involves upgrades to existing equipment. The key requirements for this market are high reliability, the ability to undertake upgrade work quickly, an emphasis on compatibility with existing control equipment, and ease of maintenance. In markets outside Japan, meanwhile, demand for electric power is growing particularly in emerging economies. Furthermore, concern for the global environment is driving demand for high levels of operating efficiency. The key requirements in these markets are reductions in both construction and generation costs, networks that comply with international standards, and ease of maintenance. Hitachi embarked on the development of upgrades to the HiStation maintenance software, control panel design, and the modules that make up the HIACS (Hitachi integrated autonomous control system), an integrated monitoring and control system for power generation. The concept behind the development was to improve installation compatibility (compact and adaptable system), ease of maintenance, compatibility with existing systems, and expandability while maintaining the existing high levels of reliability and performance. “Hi” is an abbreviation for “high security × high reliability × high value added.” This article describes the features of the nextgeneration HIACS that were enhanced in the development. OVERVIEW: Hitachi offers environmentally conscious integrated solutions for generating, transmitting, and consuming electric power based around its HIACS Series, which brings together the company’s extensive experience and skills in control technology. Hitachi has now developed a new generation of integrated monitoring and control systems for power generation that form the core of these solutions. This development included updating the control panel design and the HiStation program maintenance software as well as controllers, I/O, and other modules. These new products retain the high reliability and performance that are a feature of the current HIACS generation and are designed to deliver superior installation compatibility (compact and adaptable system) and easier maintenance and expansion. Compatibility between generations was also considered to provide a system that is easier to use.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

SMART ROOM CARBON MONOXIDE MONITORING AND CONTROL SYSTEM

Carbon Monoxide (CO) is the most abundant air pollutant gas and accumulates rapidly to dangerous concentrations even in areas that seem to be well ventilated. Carbon monoxide detectors/alarm systems exist but people who are old, hearing impaired, partially sighted or heavy sleepers may not get the warning or find it difficult to wake up and get out in the event of dangerous concentration of CO ...

متن کامل

Environmental Planning for Wind Power Plant Site Selection using a Fuzzy PROMETHEE-Based Outranking Method in Geographical Information System

Selection of suitable sites for wind power plants is one of the most important decision on wind resources development. Site selection for the establishment of large wind power plants requires spatial evaluation taking technical, economic, and environmental considerations into account. This study has applied a combination of PROMETHEE and Fuzzy AHP methods in a geographical information system en...

متن کامل

Active and reactive power control via currents of a rotor’s d and q components with nonlinear predictive control strategy in a doubly fed induction generator based on wind power system

Wind energy today, has attracted widespread interest from among a variety of sources of renewable energy in the world. Owing to the increasing demand for production of electrical energy for electricity networks by using wind power, it is essential that wind power plants are actively incorporated in the network’s performance using an appropriate control system. In general, these wind power p...

متن کامل

Development and effectiveness of a comprehensive program for evaluating the performance of the educational system on the result of evaluation and educational accreditation of Shahid Beheshti hospital in Babol

ABSTRACT BACKGROUND AND OBJECTIVE: In order to evaluate the performance of teaching hospitals, the patterns of accreditation system as one of the most important packages of transformation and innovation plan in medical education, considered by the Ministry of Health. One of the serious challenges of the educational accreditation program is the use of a same standard set to evaluate the educatio...

متن کامل

Comprehensive landslide risk management monitoring

Background and objective: Although the risk management and crisis management issues were discussed during recent years in scientific meetings, but still there is no proper planning to deal with natural disasters. The lack of systematic attitude to landslide phenomenon and also loss of predetermined plans for responsibility of the trusted organizations and lack of coordination between these orga...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011