Vacation Scholarship Projects School of Mathematical Sciences Project Titles

نویسندگان

  • David Baraglia
  • Susan Barwick
چکیده

This project will study the concept of chaos from a mathematical viewpoint. Qualities which characterise chaos (e.g., sensitive dependence on initial conditions, presence of periodic orbits of all periods, uncountably many aperiodic orbits, and dense orbits) will be studied. Methods for analytically proving that a system is chaotic (presence of a “horseshoe,” intersection of stable and unstable manifolds, Melnikov’s method) will be applied to different systems arising in applications. Prerequisites: a second-year differential equations course.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Faculty Development course based on Project-based Approach: A Strategy for Implementing Educational Scholarship in Universities of Medical Sciences

Introduction: The present study aimed to develop an empowerment course based on project-based learning to enhance scholar skills of faculty members. Methods: The program was developed in 4 steps consisted of problem identifications and needs assessment, identifying the goals and objectives, definition of teaching-learning and assessment methods. In the present study, the Delphi technique was a...

متن کامل

A new framework for high-technology project evaluation and project portfolio selection based on Pythagorean fuzzy WASPAS, MOORA and mathematical modeling

High-technology projects are known as tools that help achieving productive forces through scientific and technological knowledge. These knowledge-based projects are associated with high levels of risks and returns. The process of high-technology project and project portfolio selection has technical complexities and uncertainties. This paper presents a novel two-parted method of high-technology ...

متن کامل

Forecasting Final Schedule and Cost of Projects by Using Statistical and Mathematical Method

Earned value management (EVM) has prepared some methods to forecast final costs of projects. These methods were not developed since the start of formation and were gradually completed, of course with one exception that is its authenticity, they are still remained unchanged. At the present time EVM guide does not apply from schedule indices to forecast schedule for completion of project and ...

متن کامل

A MATHEMATICAL MODEL FOR SELECTING THE PROJECT RISK RESPONSES IN CONSTRUCTION PROJECTS

Risks are natural and inherent characteristics of major projects. Risks are usually considered independently in analysis of risk responses. However, most risks are dependent on each other and independent risks are rare in the real world. This paper proposes a model for proper risk response selection from the responses portfolio with the purpose of optimization of defined criteria for projects. ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013