How real is the new SIA roadmap for mixed-signal test equipment?
نویسنده
چکیده
منابع مشابه
SIA Roadmap: test must not limit future technologies
will inevitably be much debate about the accuracy of the 1997 SIA Roadmap. (Will we be building devices of 100M transistors that go at frequencies of 2GHz by the year 2002 ... or will it happen later?) Although many of the actual numbers and dates will be different than predicted in the SIA Roadmap, some key trends are obvious and will inevitably impact testing methods. These key trends include...
متن کاملBlind Signal Separation Using an Extended Infomax Algorithm
The Infomax algorithm is a popular method in blind source separation problem. In this article an extension of the Infomax algorithm is proposed that is able to separate mixed signals with any sub- or super-Gaussian distributions. This ability is the results of using two different nonlinear functions and new coefficients in the learning rule. In this paper we show how we can use the distribution...
متن کاملBlind Signal Separation Using an Extended Infomax Algorithm
The Infomax algorithm is a popular method in blind source separation problem. In this article an extension of the Infomax algorithm is proposed that is able to separate mixed signals with any sub- or super-Gaussian distributions. This ability is the results of using two different nonlinear functions and new coefficients in the learning rule. In this paper we show how we can use the distribution...
متن کاملProposed new signal for real-time stress monitoring: Combination of physiological measures
Human stress is a physiological tension that appears when a person responds to mental, emotional, or physical chal-lenges. Detecting human stress and developing methods to manage it, has become an important issue nowadays. Au-tomatic stress detection through physiological signals may be a useful method for solving this problem. In most of the earlier studies, long-term time window was considere...
متن کاملTest Today Strategies for Low-cost Test
0740-7475/01/$10.00 © 2001 IEEE November–December 2001 THE 2001 International Technology Roadmap for Semiconductors (ITRS) identifies key manufacturing issues and highlights the cost of test and the associated cost of test equipment. As our analysis of prior roadmap data in Figure 1 (next page) shows, the cost of testing a transistor will equal the cost of fabricating it by around 2012. Traditi...
متن کامل