Performance analysis and best implementations of old and newalgorithms for the Open - Pit Mining

نویسندگان

  • Dorit S. Hochbaum
  • Walter A. Haas
  • Anna Chen
چکیده

The open-pit mining problem is to determine the contours of a mine, based on economic data and engineering feasibility requirements in order to yield maximumpossible net income. This practical problem needs to be solved for very large data sets. In practice, moreover, it is necessary to test multiple scenarios taking into account a variety of realizations of geological predictions and forecasts of ore value. The industry is experiencing computational diiculties in solving the problem. Yet, the problem is known to be equivalent to the minimum cut or maximum ow problem. For the maximum ow problem there are a number of very eecient algorithms that have been developed over the last decade. On the other hand, the algorithm that is most commonly used by the mining industry has been devised by Lerchs and Grossmann (LG) LG64]. This algorithm is used in most commercial software packages for open-pit mining. This paper describes a detailed study of the LG algorithm as compared to the maximum ow \push-relabel" algorithm GT88]. We propose here an eecient implementation of the push-relabel algorithm adapted to the features of the open-pit mining problem. We study issues such as the properties of the mine and ore distribution and how they aaect the running time of the algorithm. We also study some features that improve the performance of the LG algorithm. The proposed implementations ooer signiicant improvements as compared to existing algorithms and make the related sensitivity analysis problem practically solvable.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Effects of geometrical and geomechanical properties on slope stability of open-pit mines using 2D and 3D finite difference methods

Slope stability analysis is one of the most important problems in mining and geotechnical engineering. Ignoring the importance of these problems can lead to significant losses. Selecting an appropriate method to analyze the slope stability requires a proper understanding of how different factors influence the outputs of the analyses. This paper evaluates the effects of considering the real geom...

متن کامل

ORE extraction and blending optimization model in poly- metallic open PIT mines by chance constrained one-sided goal programming

Determination a sequence of extracting ore is one of the most important problems in mine annual production scheduling. Production scheduling affects mining performance especially in a poly-metallic open pit mine with considering the imposed operational and physical constraints mandated by high levels of reliability in relation to the obtained actual results. One of the important operational con...

متن کامل

Investigation of Bishop’s and Janbu’s Models Capabilities on Slope Stability Problems with Special Consideration to Open-Pit Mining Operations

One of the most effective parameters in economics of open-pit mines is the pit slope angle, so that the slope angle more than the optimum value increases the probability of a large failure in the pit wall and the slope angle less than the optimum value leads to increasing stripping ratio and reducing net present value of mine. Therefore, in this paper, considering the limit equilibrium methods ...

متن کامل

A field investigation of application of digital terrestrial photogrammetry to characterize geometric properties of discontinuities in open-pit slopes

In order to analyze the slope stability in open-pit mines, the structural parameters of rock mass such as persistence and spatial orientation of discontinuities are characterized through field surveys, which involve spending high costs and times as well as posing high risks of rock toppling and rock fall. In the present work, a new application of terrestrial digital photogrammetry is introduced...

متن کامل

A Comprehensive Study of Several Meta-Heuristic Algorithms for Open-Pit Mine Production Scheduling Problem Considering Grade Uncertainty

It is significant to discover a global optimization in the problems dealing with large dimensional scales to increase the quality of decision-making in the mining operation. It has been broadly confirmed that the long-term production scheduling (LTPS) problem performs a main role in mining projects to develop the performance regarding the obtainability of constraints, while maximizing the whole...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1998