The Process of Sedimentation on the Surface of a Salt Marsh

نویسنده

  • Richard P. Stumpf
چکیده

An unditched salt marsh-creek drainage basin (Holland Glade Marsh, Lewes, Delaware) has a sedimentation rate of 0.5 cm year-l. During normal, storm-free conditions, the creek carries negligible amounts of sand and coarse silt. Of the material in the waters flooding the marsh surface, over 80% disappears from the floodwaters within 12 m of the creek. About one-half of the lost material is theoretically foe fine to settle, even if flow were not turbulent; however, sediment found on Spartina stems can account for the loss. The quantity of suspended sediment that does reach the back marsh during these normal tides is inadequate fo maintain the marsh surface against local sea level rise. This suspended sediment is also much finer than the deposited sediments. Additionally, remote sections of low marsh, sections flooded by only the highest spring tides, have 15-30 cm of highly inorganic marsh muds. This evidence indicates that normal tidal flooding does not produce sedimentation in Holland Glade. Study of the effects of two severe storms, of a frequency of once per year, suggests that such storms can deposit sufficient sediment to maintain the marsh. The actual deposition of fine-grained sediments (fine silt and clay) appears to result primarily from biological trapping rather than from settling. In addition, this study proposes that the total sedimentation on mature marshes results from a balance between tidal and storm sedimentation. Storms will control sediment supply and movement on microand meso-tidal marshes, and will have less influence on macro-tidal marshes.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Sedimentation Stability of Oil Well Cements in Directional Wells (TECHNICAL NOTE)

Unsuccessful cementing operation can jeopardize the whole well construction process, resulting in further costly and time consuming repair operations. The quality of cementing job is dependent on the cement composition and its properties. Design of cement composition is based on the available geological condition, materials and technical situation at well location. The cement properties like fl...

متن کامل

Efficiency of Electrocoagulation, Sedimentation and Filtration Hybrid Process in Removing Chemical Oxygen Demand and Turbidity from Carwash Industrial Wastewater: Optimization by Response Surface Methodology

Background and purpose: Nowadays, rapid growth of car wash industries has led to a demand for wastewater reclamation. In this study, the hybrid process including electrocoagulation/flotation, sedimentation, and filtration were used in treatment of real carwash wastewater. Materials and methods: In this research, the sample was first entered into the ECF reactor, then entered the retention tank...

متن کامل

Titanium Oxide (TiO2) Coatings on NiTi Shape Memory Substrate Using Electrophoretic Deposition Process

The aim of the present research is to convert bioinert surface of NiTi to bioactive and biocompatible surface. In order to develop a bioactive and corrosion resistant film on NiTi, electrophoretic deposition process was done and TiO2 particles were deposited on the NiTi surface. Suspensions including TiO2 particles were prepared using a mixture of acetone and n-butanol (0%, 30%, 60%, 80% and 10...

متن کامل

Osmotic dehydration of anchovy fillets in salt solution: Optimization by using statistical experimental design

Anchovy fillets that had undergone osmotic dehydration and response surface methodology (RSM) were used to determine the influence and optimal values of the process variables. Also the optimal processing conditions were determined in order to reduce the solid gain and water loss ratio (SG/WL) and firmnessfor the anchovy fillets. A three-levelcentral composite rotatabledesign (CCRD) involving th...

متن کامل

Estimation of annual erosion and sedimentation in Babolroud catchment using EPM and Fournier methods

One of the problems of controlling erosion and sedimentation in catchment areas is the lack of statistical data to accurately estimate the amount of sedimentation and erosion. In order to implement soil protection programs and determine methods to reduce sedimentation, it is necessary to estimate the total volume of annual sediment production. The purpose of this study is to estimate the erosio...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1983