Medical grading of the industrial worker.

نویسنده

  • J P ELIAS
چکیده

Towards the middle of 1943 the problem of supplying workers to replace the labour turn-over in a large Royal Ordnance Filling Factory became more acute through the transfer of a large number of the younger male and female workers to the forces and to other industries. Local recruitment on a large scale was necessary and in the fourth year of total war unemployed persons in an industrial area were inevitably for the most part physically substandard or aged. The level of production of filled ammunition had to be maintained and this could only be done if full use was made of the maximum productive capacity of each individual. At a meeting of senior production and labour management staffs, instructors of the Training School and the medical officers, it was agteed that the work carried out in the factory fell within five grades, and the medical department was asked to determine at the time of the entrant's examination which grade of work could be most efficiently performed by the applicant. The agreed grades of work were as follows: (1) Heavy general labouring. (2) Rough assembly, i.e. unskilled work involving the handling of stores not exceeding 25 lb. in weight. (3) Machine operating. (4) Semi-skilled assembly. (5) Skilled assembly. It was decided to limit initially the entry of graded labour to 800 men into one section of the factory, a section in which there was a demand for all five grades of labour. The selective medical examination of entrants being wholly the responsibility of the medical department, it was necessary to organize in detail a routine of examination that, in view of the large influx of new labour that was expected, would not consume too much of the time of the medical officers who had numerous other functions to carry out in the factory. All jobs carried out in the section were carefully reviewed and particuiar note made of a few specific jobs falling within the definition of each grade. Examples of these jobs are: Grade 1. Loading railway trucks in transit sheds. Grade 2. Unpacking and cleaning empty 4 2inch trench mortar bombs.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Analytical Approach for Single and Mixed-Model Assembly Line Rebalancing and Worker Assignment Problem

In this paper, an analytical approach is used for assembly line rebalancing and worker assignment for single and mixed-model assembly lines based on a heuristic-simulation algorithm. This approach helps to managers to select a better marketing strategy when different combinations of demands are suitable.Furthermore, they can use it as a guideline to know which worker assignment is better for ea...

متن کامل

A Novel Interactive Possibilistic Mixed Integer Nonlinear Model for Cellular Manufacturing Problem under Uncertainty

Elaborating an appropriate cellular manufacturing system (CMS) could solve many structural and operational issues. Thereby, considering some significant factors as worker skill, machine hardness, and product quality levels could assist the companies in current competitive environment. This paper proposes a novel interactive possibilistic mixed integer nonlinear approach to minimize the total co...

متن کامل

Simultaneous Multi-Skilled Worker Assignment and Mixed-Model Two-Sided Assembly Line Balancing

This paper addresses a multi-objective mathematical model for the mixed-model two-sided assembly line balancing and worker assignment with different skills. In this problem, the operation time of each task is dependent on the skill of the worker. The following objective functions are considered in the mathematical model: (1) minimizing the number of mated-stations (2), minimizing the number of ...

متن کامل

An algorithm for integrated worker assignment, mixed-model two-sided assembly line balancing and bottleneck analysis

This paper addresses a multi-objective mixed-model two-sided assembly line balancing and worker assignment with bottleneck analysis when the task times are dependent on the worker’s skill. This problem is known as NP-hard class, thus, a hybrid cyclic-hierarchical algorithm is presented for solving it. The algorithm is based on Particle Swarm Optimization (PSO) and Theory of Constraints (TOC) an...

متن کامل

Using Fuzzy Cognitive Maps for Prediction of Knowledge Worker Productivity Based on Real Coded Genetic Algorithm

  Improving knowledge worker productivity has been one of the most important tasks of the century. However, we have few measures or management interventions to make such improvement possible, and it is difficult to identify patterns that should be followed by knowledge workers because systems and processes in an organization are often regarded as a death blow to creativity. In this paper, we se...

متن کامل

The Rôle of the Works Doctor, or General Practitioner, in Industrial Medicine

With increasing industrialization in India, more attention is being paid to the Indian industrial worker and his health and well-being. It is a common fallacy that to obtain satisfactory results in industrial medicine highlytrained specialists and technicians are essential in the first instance. This is reflected in a tendency to send doctors overseas for prolonged training in industrial medici...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • British journal of industrial medicine

دوره 3  شماره 

صفحات  -

تاریخ انتشار 1946