IMPLEMENTATION of TCSC in CONGESTION MANAGEMENT
نویسنده
چکیده
Competition is on rise in generation and distribution, which results huge transactions. Nonetheless, transmission lines are overloaded, since transmission system provides access of electricity having limited corridors. Consequently, the probability of congestion tends to be prominent. Congestion in transmission corridors not only causes collapse of that particular area but affects other area as well. Therefore, improvement of ATC of existing network by any means is essential. For this, various FACTS devices like UPFC, SSSC, TCSC, STATCOM, etc. may be used to improve the ATC of transmission lines. In this paper TCSC is employed in IEEE 5 bus system and IEEE 30 bus system to improve the ATC of transmission lines. In this paper ACPTDFs are used to evaluate the change in line flows. Due to the change in line flows the ATC of the transmission line also reflects changes. Both the real power and reactive power flows are considered in this paper.
منابع مشابه
Congestion Management in Electricity Markets Using Demand Response Programs and Series FACTS Devices
In today’s restructured environment, congestion management plays an essential role in power system operation. Different methods are presented and discussed in this respect for congestion management in short-term and long-term intervals. It is attempted in the present paper to investigate the impact mechanism of FACTS devices and demand response programs together with generation re-dispatch as s...
متن کاملSmall Signal Stability Improvement and Congestion Management Using PSO Based TCSC Controller
In this paper an attempt has been made to study the application of Thyristor Controlled Series Capacitor (TCSC) to mitigate small signal stability problem in addition to congestion management of a heavily loaded line in a multimachine power system. The Flexible AC Transmission System (FACTS) devices such as TCSC can be used to control the power flows in the network and can help in improvement o...
متن کاملGenetic Algorithm Technique for Social Welfare Improvement Using FACTS & Generation Rescheduling
This paper presents a framework to carry out an novel method based Optimal Power Flow (OPF) for transmission congestion management in deregulated power system using Thyristor Controlled Series Capacitor (TCSC) and Generation Rescheduling. In the deregulated environment, some generators may not be willing to participate in the congestion management process for their own economic interest or some...
متن کاملOptimal Placement of TCSC for Congestion Management using Modified Particle Swarm Optimization
In a competitive power market, the task of an independent system operator (ISO) is to ensure full dispatches of the contracted power are carried out reliably. However, if it threatens the system security then ISO makes decision on the re-dispatch of the contracted power i.e., Congestion Management (CM). This paper proposes an optimal congestion management approach in a deregulated electricity m...
متن کاملOptimal Location of FACTS Devices for Congestion Management in Deregulated Power Systems
In the emerging deregulated electric power market, congestion management becomes extremely important and it can impose barrier to electric power trading. There are t w o types of congestion management methodologies to relieve congestion in transmission lines. One is non-cost free methods and another is cost-free methods, among them later method relieves the congestion technically whereas the fo...
متن کامل