Advanced planning and scheduling with collaboration processes in agile supply and demand networks

نویسندگان

  • Yohanes Kristianto
  • Mian M. Ajmal
  • Petri T. Helo
چکیده

Purpose – The general purpose of the paper is to improve supply chain (SC) responsiveness and agility by developing advanced planning and scheduling (APS) with collaboration process into agile supply and demand networks (ASDN). Design/methodology/approach – Some industrial examples are presented to extract the APS requirements, then business models that are supported by analytical models are developed into APS modules to respond to the requirements. At the end, the modules are attached into an ASDN simulator to measure the benefit of the APS with collaboration process. Findings – The results show that the APS with collaboration process is superior to existing APS software in terms of promising lead times to customers at minimum inventory level. Research limitations/implications – Since the APS with collaboration process cannot optimize transportation planning, SCs cannot therefore optimize networks by finding the optimum network configuration. Currently, the simulator needs to be tested in several possible network scenarios to find the optimal network configuration. Practical implications – The APS with collaboration process makes it possible to give guaranteed lead times at minimum inventory level. Furthermore, it is possible to combine the APS with collaboration process with enterprise resources planning or MRP II by considering the criticality of the planning. Originality/value – The attachment of APS with collaboration process business into ASDN represents the original aspect of this paper.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Dynamic configuration and collaborative scheduling in supply chains based on scalable multi-agent architecture

Due to diversified and frequently changing demands from customers, technological advances and global competition, manufacturers rely on collaboration with their business partners to share costs, risks and expertise. How to take advantage of advancement of technologies to effectively support operations and create competitive advantage is critical for manufacturers to survive. To respond to these...

متن کامل

Detailed Scheduling of Tree-like Pipeline Networks with Multiple Refineries

In the oil supply chain, the refined petroleum products are transported by various transportation modes, such as rail, road, vessel and pipeline. The latter provides one of the safest and cheapest ways to connect production areas to local markets. This paper addresses the operational scheduling of a multi-product tree-like pipeline connecting several refineries to multiple distribution centers ...

متن کامل

Incorporation of Demand Response Programs and Wind Turbines in Optimal Scheduling of Smart Distribution Networks: A Case Study

Smart distribution networks (SDNs) plays a significant role in future power networks. Accordingly, the optimal scheduling of such networks, which include planning of consumers and production sections, inconsiderably concerned in recent research studies. In this paper, the optimal planning of energy and reserve of SDNs has been studied. Technical constraints of distribution network and power gen...

متن کامل

Combining Agent-based Supply Net Simulation and Constraint Technology for Highly Efficient Simulation of Supply Networks Using Aps Systems

This paper introduces an approach for highly efficient simulation of supply networks in which several nodes use advanced planning and scheduling (APS) systems. APS systems increasingly become part of bigger companies IT landscape. Today, APS systems communicate only with the ERP system they sit on top of. If APS systems would be able to communicate with each other, qualitatively new processes f...

متن کامل

Scheduling a constellation of agile earth observation satellites with preemption

In this paper, we consider a scheduling problem for a set of agile Earth observation satellites for scanning  different parts of the Earth’s surface. We assume that preemption is allowed to prevent repetitive images and develop four different preemption policies. Scheduling is done for the imaging time window and transmission time domain to the Earth stations as well. The value of each picture ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Business Proc. Manag. Journal

دوره 17  شماره 

صفحات  -

تاریخ انتشار 2011