On the sure criticality of tasks in activity networks with imprecise durations
نویسندگان
چکیده
The notion of the necessary criticality (both with respect to path and to activity) of a network with imprecisely defined (by means of intervals or fuzzy intervals) activity duration times is introduced and analyzed. It is shown, in the interval case, that both the problem of asserting whether a given path is necessarily critical and the problem of determining an arbitrary necessarily critical path (more exactly, a subnetwork covering all the necessarily critical paths) are easy. The corresponding solution algorithms are proposed. However, the problem of evaluating whether a given activity is necessarily critical does not seem to be so easy. Certain conditions are formulated which, in some situations (but not in all possible situations), allow the necessary criticality of activities to be evaluated. The results obtained for networks with interval activity duration times are generalized to the case of networks with fuzzy activity duration times. Two effective algorithms for calculating the degree of necessary criticality of a fixed path, as well as an algorithm for determining the paths that are necessarily critical to the maximum degree, are proposed.
منابع مشابه
An Algorithm to Obtain Possibly Critical Paths in Imprecise Project Networks
We consider criticality in project networks having imprecise activity duration times. It is well known that finding all possibly critical paths of an imprecise project network is an NP-hard problem. Here, based on a method for finding critical paths of crisp networks by using only the forward recursion of critical path method, for the first time an algorithm is proposed which can find all pos...
متن کاملCriticality analysis in activity networks under incomplete information
A review of the main results obtained by the authors concerning analysis of networks with imprecise activity duration times, with a stress on the analysis of criticality, is presented.
متن کاملComputational methods for determining the latest starting times and floats of tasks in interval-valued activity networks
In project management, three quantities are often used by project managers: the earliest starting date, the latest starting date and the float of tasks. These quantities are computed by the Program Evaluation and Review Techniques/Critical Path Method (PERT/CPM) algorithm. When task durations are ill known, as is often the case at the beginning of a project, they can be modeled by means of inte...
متن کاملExpected Duration of Dynamic Markov PERT Networks
Abstract : In this paper , we apply the stochastic dynamic programming to approximate the mean project completion time in dynamic Markov PERT networks. It is assumed that the activity durations are independent random variables with exponential distributions, but some social and economical problems influence the mean of activity durations. It is also assumed that the social problems evolve in ac...
متن کاملCriticality analysis of activity networks under interval uncertainty
This paper reconsiders the PERT scheduling problem when information about task duration is incomplete. We model uncertainty on task durations by intervals. With this problem formulation, our goal is to assert possible and necessary criticality of the different tasks and to compute their possible earliest starting dates, latest starting dates and floats. This paper puts together various results ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- IEEE transactions on systems, man, and cybernetics. Part B, Cybernetics : a publication of the IEEE Systems, Man, and Cybernetics Society
دوره 32 4 شماره
صفحات -
تاریخ انتشار 2002