Design and Construction of the Pefp Timing System for a 20mev Proton Beam*
نویسندگان
چکیده
The timing system of the proton accelerator of the PEFP requires synchronization between the accelerator and the multipurpose beam lines. The system is based on an event distribution system that broadcasts the timing information globally to all the equipment. Fast I/O hardware of the timing system is to distribute appropriate timing signals to accelerator systems, including the Injector, RFQ, DTL, and user's facilities. Signals include the synchronized pulse triggers and event information of RF system and switching magnet power supplies for the 20MeV proton beam extraction.
منابع مشابه
Design of 100 Mev Proton Beam Irradiation Facility for the Pefp 100 Mev Linac *
The Proton Engineering Frontier Project (PEFP) will install a 100-MeV proton linear accelerator at Gyeong-ju site. For the beam commissioning of 100 MeV proton linac, the two target rooms (TR 103, TR 23) will be prepared as a starter among 10 target room. To design the irradiation equipment in TR 103, we have investigated general propagation shape and spatial distribution of proton beam, when 1...
متن کاملDesign and Implementation of Distributed Control System for Pefp 100-mev Proton Accelerator*
The remote control systems and user interface for the Proton Engineering Frontier Project (PEFP) 100-MeV proton accelerator have been developed for the linac subsystems. The infrastructure of the PEFP control system is to provide a network based communication, distributed control system, and a standard communication protocol. To develop an extensible and reliable control system, we have chosen ...
متن کاملFuzzy PD Cascade Controller Design for Ball and Beam System Based on an Improved ARO Technique
The ball and beam system is one of the most popular laboratory setups for control education. In this paper, we design a fuzzy PD cascade controller for a ball and beam system using Asexual Reproduction Optimization (ARO) technique. The ball & beam system consists of a servo motor, a grooved beam, and a rolling ball. This system utilizes a servo motor to control ball’s position on the beam. Chan...
متن کاملHigh Power Proton Accelerator in Korea*
A high power proton accelerator project, Proton Engineering Frontier Project (PEFP), as one of the 21C Frontier Projects promoted by Korean Government, has the goals to develop a 100 MeV high current proton linear accelerator and the user programs for its beam utilization and industrial applications. The upstream part of the 100 MeV linac, the 20 MeV linac, was successfully developed and tested...
متن کاملRemote Monitoring System for Current Transformers and Beam Position Monitors of Pefp*
PEFP(Proton Engineering Frontier Project) in Korean proton linear accelerator program has a diagnostic system with current transformers and beam position monitors. Prototype of current transformer (CT) and beam position monitor(BPPM) were made and tested successfully in tools of the beam diagnostic systems. We are preparing to monitor remotely signals from the diagnostic system. Remote monitori...
متن کامل