Scheduling Repetitive Construction Projects Using Fuzzy Linear Programming
نویسنده
چکیده
Scheduling problem for repetitive construction projects involves three conflicting objectives. These objectives are project duration, project total cost, and project total interruption time. This paper presents a multi-objective fuzzy linear programming model (FLP) for resolving this problem. Literature concerned with scheduling problems for repetitive construction projects was reviewed. Multi-objective fuzzy linear programming was then explained. The proposed model formulation was then presented. A bridge project from pertinent literature was selected for model validation purpose. An optimization of each individual objective was performed with a linear programming (LP) software (Lindo) that gave the upper and lower bounds for the multi-objective analysis. Fuzzy linear programming was then applied to optimize the solution. Two scenarios were adopted in solution. In the first scenario, the three above objectives were considered simultaneously. Analysis of the results revealed that project duration, and project total cost are deviated only by 7.2%, and 1.8%, respectively as compared to their corresponding ideal values in the crisp LP model. On the other hand, the percentage of total interruption time to project duration in FLP is 5.3% against zero in LP. In the second scenario, each two objectives were considered in a single run. The purpose is to explain how can the model's user generate and evaluate the optimal tradeoff solution between any two objectives that suit his demands.
منابع مشابه
DEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY
Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...
متن کاملFuzzy Scheduling of Repetitive Construction Projects
Uncertainty is an inherent characteristic of construction projects. Neglecting uncertainties associated with different input parameters in the planning stage could well lead to misleading and/or unachievable project schedules. The objective of this paper is to present a new approach towards scheduling repetitive construction projects while accounting for uncertainty. The paper presents an algor...
متن کاملRepetitive construction processes scheduling using mixed-integer linear programming
Many construction projects contain several identical or similar units, such as floors in multistory buildings, houses in housing developments, sections of pipelines or highways. Repetitive processes arise from the subdivision of a generalized construction process into specific activities associated with particular units. In many cases it is possible to perform individual processes (repeated in ...
متن کاملUsing Hybrid Fuzzy PROMETHEE II and Fuzzy Binary Goal Programming for Risk Ranking: A Case Study of Highway Construction Projects
Multi attribute decision making methods are considered as one of the most useful methods for solving ranking problems. In some decision making problems, while the alternatives for corresponding criteria are compared in a pairwise comparison manner, if the criteria are inherently fuzzy, debates will arise in ranking alternatives due to the closeness of the values of the criteria. In this researc...
متن کاملA MULTI-OBJECTIVE DECENTRALIZED MULTIPLE CONSTRUCTION PROJECTS SCHEDULING PROBLEM CONSIDERING PERIODIC SERVICES AND ORDERING POLICIES
In decentralized construction projects, costs are mostly related to investment, material, holding, logistics, and other minor costs for implementation. For this reason, simultaneous planning of these items and appropriate scheduling of activities can significantly reduce the total costs of the project undertaken. This paper investigates the decentralized multiple construction projects schedulin...
متن کامل