Soft due window assignment and scheduling of unit-time jobs on parallel machines

نویسندگان

  • Adam Janiak
  • Wladyslaw A. Janiak
  • Mikhail Y. Kovalyov
  • Frank Werner
چکیده

We study problems of scheduling n unit-time jobs on m identical parallel machines, in which a common due window has to be assigned to all jobs. If a job is completed within the due window, then no scheduling cost incurs. Otherwise, a job-dependent earliness or tardiness cost incurs. The job completion times, the due window location and the size are integer valued decision variables. The objective is to find a job schedule as well as the location and the size of the due window such that a weighted sum or maximum of costs associated with job earliness, job tardiness and due window location and size is minimized. We establish properties of optimal solutions of these min-sum and min-max problems and reduce them to min-sum (traditional) or min-max (bottleneck) assignment problems solvable in O(n5/m2) and O(n4.5 log0.5 n/m2) time, respectively. More efficient solution procedures are given A. Janiak (B) Institute of Computer Engineering, Control and Robotics, Wrocław University of Technology, Janiszewskiego 11/17, 50-372 Wrocław, Poland e-mail: [email protected] W. Janiak Faculty of Computer Science and Management, Wrocław University of Technology, Łukasiewicza 5, 50-371 Wrocław, Poland e-mail: [email protected] M. Y. Kovalyov United Institute of Informatics Problems, National Academy of Sciences of Belarus, Surganova 6, 220012 Minsk, Belarus e-mail: [email protected] F. Werner Faculty of Mathematics, Otto-von-Guericke-University Magdeburg, PSF 4120, 39016 Magdeburg, Germany e-mail: [email protected]

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs

Nowadays, by successful application of on time production concept in other concepts like production management and storage, the need to complete the processing of jobs in their delivery time is considered a key issue in industrial environments. Unrelated parallel machines scheduling is a general mood of classic problems of parallel machines. In some of the applications of unrelated parallel mac...

متن کامل

Solving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs

Nowadays, by successful application of on time production concept in other concepts like production management and storage, the need to complete the processing of jobs in their delivery time is considered a key issue in industrial environments. Unrelated parallel machines scheduling is a general mood of classic problems of parallel machines. In some of the applications of unrelated parallel mac...

متن کامل

Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints

This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...

متن کامل

A bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics

This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity,...

متن کامل

Due window assignment and scheduling on parallel machines: a FPTAS for a bottleneck criterion

A fully polynomial time approximation scheme (FPTAS) with run time O( n m εm−1 ) is developed for a problem which combines common due window assignment and scheduling n jobs on m identical parallel machines. The problem criterion is bottleneck (min-max) such that the maximum cost, which includes job earliness, job tardiness and due window size costs, is minimized.

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • 4OR

دوره 10  شماره 

صفحات  -

تاریخ انتشار 2012