Multi-product economic lot scheduling problem with manufacturing and remanufacturing using a basic period policy

نویسندگان

  • Simone Zanoni
  • Anders Segerstedt
  • Ou Tang
  • Laura Mazzoldi
چکیده

In this research we study the multi-product economic lot scheduling problem (ELSP) with manufacturing and remanufacturing opportunities. Manufacturing and remanufacturing operations are performed on the same production line. Both manufactured and remanufactured products have the same quality thus fulfil the same demand stream. Tang and Teunter (2006) firstly studied this type of economic lot scheduling problem with returns (ELSPR) and presented a complex algorithm for the optimal solution. More recently Teunter et al (2009) proposed several heuristics to deal with the same problem using more computational efficient approaches. However, both studies have limited the attention to the common cycle policy with the assumption that single (re)manufacturing lot is used for each item in each cycle. Relaxing the constraint of common cycle time and a single (re)manufacturing lot for each item in each cycle, we propose a simple, easy to implement algorithm, based on Segerstedt (1999), to solve the model using a basic period policy. Several numerical examples show the applicability of the algorithm and the cost savings.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing

We study the economic lot scheduling problem with two production sources, manufacturing and remanufacturing, for which operations are performed on separate, dedicated lines. We develop an exact algorithm for finding the optimal common-cycle-time policy. The algorithm combines a search for the optimal cycle time with a mixed integer programming (MIP) formulation of the problem given a fixed cycl...

متن کامل

A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times

Many authors have examined lot sizing, scheduling and sequence of multi-product flow shops, but most of them have assumed that set up times are independent of sequence. Whereas dependence of set up times to sequence is more common in practice. Hence, in this paper, we examine the discussed problem with hypothesis of dependence of set up times to sequence and cyclic schedule policy in basic peri...

متن کامل

A Basic Period Approach for Solving the Economic Lot and Delivery Scheduling in Flexible Flow Lines

In this paper, the problem of lot sizing, scheduling and delivery of several items in a two-stage supply chain over a finite planning horizon is studied. Single supplier via a flexible flow line production system (FFL), produces several items and delivers them directly to an assembly facility. Based on basic period (BP) strategy, a new mixed zero-one nonlinear programming model has been develop...

متن کامل

Three Metaheuristic Algorithms for Solving the Multi-item Capacitated Lot-sizing Problem with Product Returns and Remanufacturing

This paper proposes a new mixed integer programming model for multi-item capacitated lot-sizing problem with setup times, safety stock and demand shortages in closed-loop supply chains. The returned products from customers can either be disposed or be remanufactured to be sold as new ones again. Due to the complexity of problem, three meta-heuristics algorithms named simulated annealing (SA) al...

متن کامل

Optimum Aggregate Inventory for Scheduling Multi-product Single Machine System with Zero Setup Time

In this paper we adopt the common cycle approach to economic lot scheduling problem and minimize the maximum aggregate inventory. We allow the occurrence of the idle times between any two consecutive products and consider limited capital for investment in inventory. We assume the setup times are negligible. To achieve the optimal investment in inventory we first find the idle times which minimi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & Industrial Engineering

دوره 62  شماره 

صفحات  -

تاریخ انتشار 2012