Three-Machine Flowshop Scheduling Problem to Minimize Total Completion Time with Bounded Setup and Processing Times
نویسندگان
چکیده
The three-machine flowshop scheduling problem to minimize total completion time is studied where setup times are treated as separate from processing times. Setup and processing times of all jobs on all machines are unknown variables before the actual occurrence of these times. The lower and upper bounds for setup and processing times of each job on each machine is the only information that is available. In such a scheduling environment, there may not exist a unique schedule that remains optimal for all possible realizations of setup and processing times. Therefore, it is desired to obtain a set of dominating schedules (which dominate all other schedules) if possible. The objective for such a scheduling environment is to reduce the size of dominating schedule set. We obtain global and local dominance relations for a three-machine flowshop scheduling problem. Furthermore, we illustrate the use of dominance relations by numerical examples and conduct computational experiments on randomly generated problems to measure the effectiveness of the developed dominance relations. The computational experiments show that the developed dominance relations are quite helpful in reducing the size of dominating schedules.
منابع مشابه
Two-machine Flowshop Scheduling Problem to Minimize Makespan or Total Completion Time with Random and Bounded Setup Times
This paper addresses the two-machine flowshop scheduling problemwith separate setup times to minimize makespan or total completion time (TCT). Setup times are relaxed to be random variables rather than deterministic as commonly used in the OR literature. Moreover, distribution-free setup times are used where only the lower and upper bounds are given. Global and local dominance relations are dev...
متن کاملA fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates
This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...
متن کاملFlowshop Scheduling with Random and Bounded Setup Times
The two-machine permutation flowshop scheduling problem to minimize makespan or total completion time criterion is addressed where setup times are considered to be separate from processing times. Setup times are relaxed to be random variables as opposed to the common assumption in the literature that setup times are exactly known (deterministic) in advance. The probability distributions of setu...
متن کاملPareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times
This paper addresses an unrelated multi-machine scheduling problem with sequence-dependent setup time, release date and processing set restriction to minimize the sum of weighted earliness/tardiness penalties and the sum of completion times, which is known to be NP-hard. A Mixed Integer Programming (MIP) model is proposed to formulate the considered multi-criteria problem. Also, to solve the mo...
متن کاملA three-stage assembly flow shop scheduling problem with blocking and sequence-dependent set up times
This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup < /div> times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditiona...