Incentives for New Investment in a Deregulated Market for Electricity∗

نویسندگان

  • Timothy Mount
  • Xiaobin Cai
چکیده

All decisions about investments in new generation, transmission, distributed energy resources and load management are based on expectations about future market conditions. This paper develops an analytical framework for evaluating forward contracts and investment decisions under the assumption that firms are risk averse. A fixed price/fixed quantity delivery contract forms the basis for the portfolio of a Distribution Company (DISCO). It is supplemented by a two-part contract for peaking capacity (A variable charge for real energy delivered and a fixed charge for capacity). The prices and quantities of these contracts are optimized to provide an equilibrium solution between the DISCOs and the Generating Companies (GENCOs) with equal market power for each side of the market. Additional purchases of electricity may be made in a spot market that is characterized by infrequent price spikes during the summer months. These price spikes make the spot market very risky for a DISCO because customers pay a fixed regulated rate to the DISCO. Using a set of realistic assumptions about price behavior in the spot market, the results show that the optimum quantity of capacity contracted by the DISCO is substantially above the average on-peak load for the summer. From the perspective of a potential investor in new generating capacity, the net revenue from a peaking contract is shown to be less than 30% of the level needed to justify the investment. The additional annual premium needed to build 1000MW of new peaking capacity is shown to be much smaller than the equivalent cost of two alternative policies that attempt to make the market give the “right” signals for a new investment. The first policy is to ensure that the annualized capital cost of new peaking capacity can be recovered by increasing the price paid for availability in an ICAP (capacity) market. This higher price is paid for all capacity in the ICAP market and not just for the new investment. The second policy is to allow higher price spikes in the spot market, keeping the average spot price constant. The additional risk faced by a DISCO with higher and more volatile spot prices puts a GENCO in a strong position to extract a substantial risk premium from the DISCO above the expected spot price. This risk premium leads to an increase in the total cost paid by a DISCO when price spikes are allowed. However, the additional cost of investing in new peaking capacity is less than half the corresponding increased cost using higher ICAP payments.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

CSEM WP 164 An Equilibrium Model of Investment in Restructured Electricity Markets

In this paper, we describe a framework for modeling investment in restructured electricity markets. This framework is extremely flexible, and is designed to be able to capture many of the key considerations that distinguish investment in deregulated electricity markets from both investment in regulated markets, and investment in competitive markets for other commodities. The model is composed o...

متن کامل

A New Approach for Accurate Pricing of Reactive Power and Its Application to Cost Allocation in Deregulated Electricity Markets

Reactive power management plays an essential role in the secure operation of the power system as an ancillary service. Although in electricity markets, the particular attention is paid to active power, the reactive power also plays an important on total generation costs of electricity. On the other hand, as it is mainly confined to local consumption, to avoid market power and maintain the se...

متن کامل

A Multi-objective Transmission Expansion Planning Strategy: A Bilevel Programming Method

This paper describes a methodology for transmission expansion planning (TEP) within a deregulated electricity market. Two objective functions including investment cost (IC) and congestion cost (CC) are considered. The proposed model forms a bi-level optimization problem in which upper level problem represents an independent system operator (ISO) making its decisions on investment while in the l...

متن کامل

A New Iterative Neural Based Method to Spot Price Forecasting

Electricity price predictions have become a major discussion on competitive market under deregulated power system. But, the exclusive characteristics of electricity price such as non-linearity, non-stationary and time-varying volatility structure present several challenges for this task. In this paper, a new forecast strategy based on the iterative neural network is proposed for Day-ahead price...

متن کامل

Veronika Grimm ; Gregor Zöttl : Investment Incentives and Electricity Spot Market

In liberalized electricity markets strategic firms compete in an environment characterized by fluctuating demand and non-storability of electricity. While spot market design under those conditions by now is well understood1, a rigorous analysis of investment incentives is still missing. Existing models, as the peak-load-pricing approach, analyze welfare optimal investment and find that optimal ...

متن کامل

Transmission Planning in Deregulated Environments

A new market based approach for transmission expansion planning in deregulated environments is presented in this paper. In this approach, transmission-planning decisions are made based on the electric power market conditions. The main contribution of this research is 1) Introducing a new probabilistic tool for analyzing the electric market conditions, 2) Defining new criteria for ranking transm...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007