Railway Crew Rescheduling with Retiming
نویسندگان
چکیده
Railway operations are disrupted frequently, e.g. the Dutch railway network experiences about three large disruptions per day on average. In such a disrupted situation railway operators need to quickly adjust their resource schedules. Nowadays, the timetable, the rolling stock and the crew schedule are recovered in a sequential way. In this paper, we model and solve the crew rescheduling problem with retiming. This problem extends the crew rescheduling problem by the possibility to delay the departure of some trains. In this way we partly integrate timetable adjustment and crew rescheduling. The algorithm is based on column generation techniques combined with Lagrangian heuristics. In order to prevent a large increase in computational time, retiming is allowed only for a limited number of trains where it seems very promising. Computational experiments with real-life disruption data show that, compared to the classical approach, it is possible to find better solutions by using crew rescheduling with retiming.
منابع مشابه
An Iterative Framework for Real-time Railway Rescheduling
Since disruptions in railway networks are inevitable, railway operators and infrastructure managers need reliable measures and tools for disruption management. Current literature on railway disruption management focuses most of the time on rescheduling one resource (timetable, rolling stock or crew) at the time. In this research, we describe an iterative framework in which all three resources a...
متن کاملAlgorithmic Support for Railway Disruption Management
Disruptions of a railway system are responsible for longer travel times and much discomfort for the passengers. Since disruptions are inevitable, the railway system should be prepared to deal with them effectively. This paper explains that, in case of a disruption, rescheduling the timetable, the rolling stock circulation, and the crew duties is so complex that solving them manually is too time...
متن کاملAn Overview of Recovery Models and Algorithms for Real-time Railway Rescheduling
This paper presents an overview of recovery models and algorithms for real-time railway disturbance and disruption management. This area is currently an active research area in Operations Research, including real-time timetable rescheduling and real-time rescheduling of the rolling stock and crew duties. These topics are addressed in this paper. Also research dealing with the integration of mor...
متن کاملReal-time train driver rescheduling by actor-agent techniques
Passenger railway operations are based on an extensive planning process for generating the timetable, the rolling stock circulation, and the crew duties for train drivers and conductors. In particular, crew scheduling is a complex process. After the planning process has been completed, the plans are carried out in the real-time operations. Preferably, the plans are carried out as scheduled. How...
متن کاملRail Crew Re-Scheduling: from Planning towards Operations
In the Dutch railway network, there are a few times per week modifications in the timetable necessary due to unexpected maintenance projects or planned maintenance project that finish later than expected. Moreover, there are about 20 disruptions per day on average. These disruptions can be caused by the infrastructure (e.g. broken switches, no power supply), the weather (e.g. longer braking tim...
متن کامل