A note on the proportionate flow shop with a bottleneck machine

نویسندگان

  • Christos Koulamas
  • George J. Kyparisis
چکیده

Choi, B.-C., Yoon, S.-H., Chung, S.-J., 2007. Minimizing maximum completion time in a proportionate flow shop with one machine of different speed. European Journal of Operational Research 176, 964–974 consider the proportionate flow shop with a slow bottleneck machine and propose the SLDR heuristic for it. Choi et al. (2007) derive a data-dependent worst-case ratio bound for the SLDR heuristic which is then bounded by two. In this note, we show that the tight worst-case ratio bound of the SLDR heuristic is 3/2. 2008 Elsevier B.V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving Re-entrant No-wait Flow Shop Scheduling Problem

In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...

متن کامل

Improving for Drum_Buffer_Rope material flow management with attention to second bottlenecks and free goods in a job shop environment

Drum–Buffer–Rope is a theory of constraints production planning methodology that operates by developing a schedule for the system’s first bottleneck. The first bottleneck is the bottleneck with the highest utilization. In the theory of constraints, any job that is not processed at the first bottleneck is referred to as a free good. Free goods do not use capacity at the first bottleneck, so very...

متن کامل

A note on makespan minimization in proportionate flow shops

We consider two generalizations of the proportionate flow shop scheduling problem with the makespan objective. Each job has a processing requirement and each machine has a characteristic value. In our first (second) case we assume that the time a job occupies a machine is the maximum (minimum) of the processing requirement of the job and the characteristic value of the machine. We show that the...

متن کامل

A Fuzzy Algorithm for the m-Machine, n-Job Flow Shop Sequencing Problem

Flow shop sequencing problem is included in NP-hard problems and a number of heuristic methods have been developed to solve it. Most of these methods are offered for the crisp processing time. However fuzzy algorithm is appropriate for the problems with fuzzy processing time. This paper presents a method in which an algorithm is used to minimize make span of flow shop with fuzzy processing time...

متن کامل

A Fuzzy Algorithm for the m-Machine, n-Job Flow Shop Sequencing Problem

Flow shop sequencing problem is included in NP-hard problems and a number of heuristic methods have been developed to solve it. Most of these methods are offered for the crisp processing time. However fuzzy algorithm is appropriate for the problems with fuzzy processing time. This paper presents a method in which an algorithm is used to minimize make span of flow shop with fuzzy processing time...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 193  شماره 

صفحات  -

تاریخ انتشار 2009