CROSS cyclic resource-constrained scheduling solver

نویسندگان

  • Alessio Bonfietti
  • Michele Lombardi
  • Luca Benini
  • Michela Milano
چکیده

Article history: Received 5 December 2012 Received in revised form 2 August 2013 Accepted 30 September 2013 Available online 8 October 2013

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

AN EXPERIMENTAL INVESTIGATION OF THE SOUNDS OF SILENCE METAHEURISTIC FOR THE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH PRE-OPTIMIZED REPERTOIRE ON THE HARDEST MMLIB+ SET

This paper presents an experimental investigation of the Sounds of Silence (SoS) harmony search metaheuristic for the multi-mode resource-constrained project scheduling problem (MRCPSP) using a pre-optimized starting repertoire. The presented algorithm is based on the time oriented version of the SoS harmony search metaheuristic developed by Csébfalvi et al. [1] for the single-mode resource-con...

متن کامل

The preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach

Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

متن کامل

Uncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem

Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...

متن کامل

Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)

Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...

متن کامل

A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations

The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Artif. Intell.

دوره 206  شماره 

صفحات  -

تاریخ انتشار 2014