One Heuristics for Production Planning Problem with Sequence Dependent Setups

نویسندگان

  • Zrinka Lukač
  • Kristina Šorić
چکیده

Each of n items (products) is to be processed on two, capacity limited machines in order to satisfy known demands in each of T periods. Only one item can be processed on each machine at any given time and period. Each switch from one item to another requires sequence dependent setup time. The object is to minimize the sum of the costs of production, storage and setup. We define a quadratic mixed 0-1 integer programming problem called Production Planning Problem with Sequence Dependent Setups. We develop a heuristics based on tabu search and Lagrangean relaxation for solving the problem. At the end, some computational results are presented.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Relax and Fix Heuristics for Simultaneous Lot Sizing and Sequencing the Permutation Flow Shops with Sequence-Dependent Setups

  This paper proposes two relax and fix heuristics for the simultaneous lot sizing and sequencing problem in permutation flow shops involving sequence-dependent setups and capacity constraints. To evaluate the effectiveness of mentioned heuristics, two lower bounds are developed and compared against the optimal solution. The results of heuristics are compared with the selected lower bound .

متن کامل

The Economic Lot Scheduling Problem in Flow Lines with Sequence-Dependent Setups

  The problem of lot sizing, sequencing and scheduling multiple products in flow line production systems has been studied by several authors. Almost all of the researches in this area assumed that setup times and costs are sequence –independent even though sequence dependent setups are common in practice. In this paper we present a new mixed integer non linear program (MINLP) and a heuristic me...

متن کامل

Finite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups

This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....

متن کامل

An economic production model for deteriorating items and time dependent demand with rework and multiple production setups

Recently, much emphasis has given to study the control and maintenance of production inventories of the deteriorating items. Rework is one of the main issues in reverse logistic and green supply chain, since it can reduce production cost and the environmental problem. Many researchers have focused on developing rework model, but few of them have developed model for deteriorating items. Due to t...

متن کامل

A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times

Many authors have examined lot sizing, scheduling and sequence of multi-product flow shops, but most of them have assumed that set up times are independent of sequence. Whereas dependence of set up times to sequence is more common in practice. Hence, in this paper, we examine the discussed problem with hypothesis of dependence of set up times to sequence and cyclic schedule policy in basic peri...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005