Evolutionary optimization of model specification searches between project management knowledge and construction engineering performance

نویسندگان

  • Jui-Sheng Chou
  • Jung-Ghun Yang
چکیده

Many studies have attempted to specify alternative model configurations as fitting empirical data with the aid of structural equation modeling (SEM) method. However, significant path searching between constructs has increased in difficulty and complexity. One way to enhance modeling efficiency is evolutionary optimization by genetic algorithm (GA). This study applies the project management (PM) knowledge possessed by construction personnel and uses techniques, tools, and skills (TTS) to explore the causal relationship between TTS usage and construction engineering project performance (PP). A questionnaire survey is used to empirically measure the effectiveness of PM TTS on PP. The research framework is first defined by hypotheses supported by the literature. The GA is then applied to the model fitting process to optimize the structural paths. Analytical results show that evolutionary optimization for singular and multiple goodness of fit effectively searches the SEM specifications. By using GA in SEM procedure, researchers can perform automated specification searches to find the best empirical model fit to the data. 2013 Elsevier Ltd. All rights reserved.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project

This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...

متن کامل

An Energy-efficient Mathematical Model for the Resource-constrained Project Scheduling Problem: An Evolutionary Algorithm

In this paper, we propose an energy-efficient mathematical model for the resource-constrained project scheduling problem to optimize makespan and consumption of energy, simultaneously. In the proposed model, resources are speed-scaling machines. The problem is NP-hard in the strong sense. Therefore, a multi-objective fruit fly optimization algorithm (MOFOA) is developed. The MOFOA uses the VIKO...

متن کامل

Time Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry

This paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. The output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (LLNF) model, is useful for assessing a project status at different time horizons. Being trained by a locally linear model tree (LOLIMOT) learning algorithm, the model is int...

متن کامل

Improvement of project management office performance: An empirical investigation of effective factors in iranian construction industry

Project management office (PMO) is a new emerging concept in Iranian construction industry. Executives expect this organizational unit to add value to the business, and meet the demands of stakeholders by performing specialized tasks ranging from providing project management support to portfolio management. In this regard, PMO managers have long faced the question of how to improve the performa...

متن کامل

A Budgeting Model for the Safety Unit of an Under Construction Metro Station in Tehran Using a Robust Optimization

Background: The construction of metro lines is a high-risk project. Using a budget-based model for the safety units of metro construction projects can help safety managers to spend optimal budget allocation. The purpose of this study was to plan a budget model based on safety unit performance in an under construction metro station for better budget allocation using robust optimization. Methods...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Expert Syst. Appl.

دوره 40  شماره 

صفحات  -

تاریخ انتشار 2013