Non-Convex Costs and Capital Utilization: A Study of Production and Inventories at Automobile Assembly Plants

نویسنده

  • George J. Hall
چکیده

This paper studies how managers at automobile assembly plants organize production across time. Detailed data from eleven single-source automobile assembly plants display considerable cross-plant heterogeneity. At plants which make lowand medium-selling vehicles the capital stock often sits idle, production is more variable than sales, and weeklong shutdowns are often used to vary output. In contrast, at plants which make high-selling vehicles, the capital stock rarely sits idle, production is about as variable as sales, and overtime { not weeklong shutdowns { is most frequently used to vary output. To explain this di erence in production scheduling, I formulate and solve a dynamic programming model of a plant manager. The solution to the dynamic program predicts that when sales are low, non-convexities at the plant level induce the manager to bunch production at points of low average cost; thus, the manager uses less than full capital utilization on average and makes production more volatile than sales. When sales are high, the plant operates in a convex region of the cost curve. Hence the manager employs high levels of capital utilization and makes production about as volatile than sales.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Non-convex costs and capital utilization: A study of production scheduling at automobile assembly plants ¬リニ

I study detailed data from eleven automobile assembly plants. These data display considerable cross-plant heterogeneity in production scheduling. To explain the observed heterogeneity, I solve a dynamic programming model. When desired production is below the plant's minimum e$cient scale, non-convexities induce production bunching; the plant uses less than full capital utilization on average an...

متن کامل

Assembly line performance and modeling

Automobile sector forms the backbone of manufacturing sector. Vehicle assembly line is important section in automobile plant where repetitive tasks are performed one after another at different workstations. In this thesis, a methodology is proposed to reduce cycle time and time loss due to important factors like equipment failure, shortage of inventory, absenteeism, set-up, material handling, r...

متن کامل

Postural Ergonomic Risk Assessment (Pera) in The Workers of the Automobile Parts Assembly Line: A New Observational Method for the Cube Model

Assembly lines are associated with health risk and musculoskeletal disorders, particularly in the upper limbs. The aim of this study was to analyze three risk factors of posture, duration and force by using the postural ergonomic risk assessment (PERA) method in the workers of the assembly unit of automobile parts. Material and Methods: This descriptive cross-sectional study was conducted in th...

متن کامل

Inventory investment and the cost of capital

We examine the relation between inventory investment and the cost of capital in the time series and the cross section. We find consistent evidence that risk premiums, rather than real interest rates, are strongly negatively related to future inventory growth at the aggregate, industry, and firm levels. The effect is stronger for firms in industries that produce durables rather than nondurables,...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1996