An 00 Project Manauement Needs Assessment

نویسنده

  • Babak Sadr
چکیده

bject technology is seen by many as the Yellow Brick Road to improved productivity, reliability, maintainability, and software 0 reusability. Because of this, the software development community rushed to adopt OT. As with all technological breakthroughs, OT has yielded successes and failures. The failures have been due largely to inexperience and a lack of planning by project managers for the transition to OT. OT is tremendously helpful in achieving strategic goals and fulfilling business needs. However, because it is relatively new, it requires a transition plan, and its implementation must be closely supervised.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

Needs assessment in medical education with emphasis on outcome-based education: Systematic review

Outcome-based education has a key role in the development of medical education and emphasizes on empowering students according to the needs of society. The purpose of this study is to determine the components and implementation methods of educational needs assessment based on outcome. Methods: The present article is a review study through systematic search in valid domestic and foreign scienti...

متن کامل

Faculty Development course based on Project-based Approach: A Strategy for Implementing Educational Scholarship in Universities of Medical Sciences

Introduction: The present study aimed to develop an empowerment course based on project-based learning to enhance scholar skills of faculty members. Methods: The program was developed in 4 steps consisted of problem identifications and needs assessment, identifying the goals and objectives, definition of teaching-learning and assessment methods. In the present study, the Delphi technique was a...

متن کامل

An Assessment Method for Project Cash Flow under Interval-Valued Fuzzy Environment

Effective project management requires reliable knowledge of cash required in different stages of project life cycle. Getting this knowledge is highly dependent on sophisticated consideration of project environment. Nature of projects and their environments are associated with uncertain conditions. In this paper, a new project cash flow assessment method based on project scheduling is proposed t...

متن کامل

Learning From Past; Assessment of the Post-War Reconstruction of Qasr-e-Shirin in Iran

This paper addresses the post-war reconstruction experience of Qasr-e-Shirin, Iran, in the aftermath of the Iran-Iraq war (1980-1988). Compared with the war-damaged cities in southwest Iran, western cities such as Qasr-e-Shirin lack a post-war reconstruction assessment and documentation. With an objective view, the author aims at documenting the situation of the city almost thirty years after i...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004