4D integrated technologies and process simulation of progress of the project management methods

نویسندگان

  • Zhang Yang
  • Jian-Ping Zhang
  • Lu Ming
  • Yang Zhang
  • Ming Lu
چکیده

Effective and detailed planning of large-scale, complex construction projects is of great importance to fulfilling project cost and time objectives. At Tsinghua University of China and The Hong Kong Polytechnic University, the four dimensional-computer aided design (4D construction operations simulation methodology have been researched for years respectively, resulting in innovative, in construction planning. By crossing upon the two areas, we propose a construction planning methodology that integrates critical path method (CPM) 4D-CAD with operations simulation in order to provide a more useful tool that overcomes the shortcomings of the current ones. The trial application of the methodology on a precast viaduct construction project in Hong Kong is presented.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Integrated Baseline Geodatabase for Facilitating the Environmental Impact Assessment Process: Case Study of Sabalan Geothermal Project, Iran

Baseline data represent one of the important stages of Environmental Impact Assessment (EIA) procedure that describes the existing environment of the study area and surrounding areas in enough detail to allow the environmental impacts of the proposed area to be accurately and adequately assessed, and future changes and effects can be measured. Baseline data may be inaccurate, difficult to obtai...

متن کامل

A Simulation Based of Setting Policy in Project Acceptance Based on Experiences in Project-Driven SME's

The acceptance of the right project which leads to the realization of the set objectives is one of the most important issues in project-oriented companies. Therefore, corporate managers prefer to work on those projects which ensures the achievement of goals such as increasing financial profits or being the top brands in their rivals market. The present  research aimed at introducing  a systemat...

متن کامل

Establishing Control Limits on Time Performance Indicators of Projects through Monte Carlo Simulation and Earned Duration Management

Earned Duration Management (EDM) method has been developed to enhance Earned Value Management and to solve some of its problems, such as separation of measuring time and cost dimensions. By providing performance indicators, this method makes it possible for managers to accurately measure the progress of a project and to calculate the time and cost required to complete it. Nevertheless, the acce...

متن کامل

Introducing a Project Management Framework for Transfer of Technologies

This paper aims at emphasizing the importance of establishing a Project Management (PM) system in Technology Transfer (TT) processes and developing a conceptual framework for it. TT is an important process in Technology Management affairs for all enterprises.  Most of the time, lack of a particular concentration on technical, commercial and legal aspects of TT process, leads to mismanagement of...

متن کامل

An integrated simulation-DEA approach to multi-criteria ranking of scenarios for execution of operations in a construction project

The purpose of this study is to examine different scenarios for implementing operations in the pre-construction phase of a project, based on several competing criteria with different importance levels in order to achieve a more efficient execution plan. This paper presents a new framework that integrates discrete event simulation (DES) and data envelopment analysis (DEA) to rank different scena...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009