Complexity of Workforce Scheduling in Transfer Lines
نویسندگان
چکیده
Consider a production system that consists of m assembly stations arranged in series. All jobs enter the assembly line at station 1 and proceed with subsequent stations in the same order as in a ßow shop. Each job spends a Þxed amount of time c in each station, known as the production cycle. This production system is synchronous or paced because jobs move one station forward synchronously, every c time units. To ensure that all required work is performed in precisely c periods, the appropriate number of workers is assumed to be known for every task in each station. Hence, each job is speciÞed by an m-tuple of workforce requirements. We are interested in level workforce schedules where workforce size ßuctuations are minimal during the production horizon. In this article we deÞne level workforce scheduling objectives and analyze the complexity status of the associated problems. We Þnd that most of these problems are NP-complete even when m = 2.
منابع مشابه
The Finite Horizon Economic Lot Scheduling in Flexible Flow Lines
This paper addresses the common cycle multi-product lot-scheduling problem in flexible flow lines (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unite while satisfying the demands without backlogging. This problem consists of a combi...
متن کاملScheduling of Multiple Autonomous Guided Vehicles for an Assembly Line Using Minimum Cost Network Flow
This paper proposed a parallel automated assembly line system to produce multiple products having multiple autonomous guided vehicles (AGVs). Several assembly lines are configured to produce multiple products in which the technologies of machines are shared among the assembly lines when required. The transportation between the stations in an assembly line (intra assembly line) and among station...
متن کاملFlow shop operator scheduling through constraint satisfaction and constraint optimisation techniques
Workers scheduling in not highly automated production lines is an important task, especially when in a production line the number of operators is less than the number of workstations. Finding an optimal distribution plan can increase the line throughput, managing the workforce and the workload in a better way. This work focuses on the operator-scheduling problem for an electromechanical assembl...
متن کاملModelling and Scheduling Lot Streaming Flexible Flow Lines
Although lot streaming scheduling is an active research field, lot streaming flexible flow lines problems have received far less attention than classical flow shops. This paper deals with scheduling jobs in lot streaming flexible flow line problems. The paper mathematically formulates the problem by a mixed integer linear programming model. This model solves small instances to optimality. Moreo...
متن کاملA Basic Period Approach for Solving the Economic Lot and Delivery Scheduling in Flexible Flow Lines
In this paper, the problem of lot sizing, scheduling and delivery of several items in a two-stage supply chain over a finite planning horizon is studied. Single supplier via a flexible flow line production system (FFL), produces several items and delivers them directly to an assembly facility. Based on basic period (BP) strategy, a new mixed zero-one nonlinear programming model has been develop...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- J. Global Optimization
دوره 27 شماره
صفحات -
تاریخ انتشار 2003