Scheduling Jobs and a Variable Maintenance on a Single Machine with Common Due-Date Assignment
نویسنده
چکیده
We investigate a common due-date assignment scheduling problem with a variable maintenance on a single machine. The goal is to minimize the total earliness, tardiness, and due-date cost. We derive some properties on an optimal solution for our problem. For a special case with identical jobs we propose an optimal polynomial time algorithm followed by a numerical example.
منابع مشابه
SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملParallel Jobs Scheduling with a Specific Due Date: Asemi-definite Relaxation-based Algorithm
This paper considers a different version of the parallel machines scheduling problem in which the parallel jobs simultaneously requirea pre-specifiedjob-dependent number of machines when being processed.This relaxation departs from one of the classic scheduling assumptions. While the analytical conditions can be easily statedfor some simple models, a graph model approach is required when confli...
متن کاملSingle machine slack due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity
In this paper, we consider the slack due-window assignment model and study a single machine scheduling problem of linear time-dependent deteriorating jobs and a deteriorating maintenance activity. The cost for each job consists of four components: earliness, tardiness, window location and window size. The objective is to schedule the jobs and to assign the maintenance activity and due-windows s...
متن کاملMinimizing Total Weighted Tardiness with Drop Dead Dates in Single Machine Scheduling Problem
This paper deals with minimization of tardiness in single machine scheduling problem when each job has two different due-dates i.e. ordinary due-date and drop dead date. The drop dead date is the date in which jobs’ weights rise sharply or the customer cancels the order. A linear programming formulation is developed for the problem and since the problem is known to be NP-hard, three heuristic...
متن کاملJIT single machine scheduling problem with periodic preventive maintenance
This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
دوره 2014 شماره
صفحات -
تاریخ انتشار 2014