The coordinated scheduling of steelmaking with multi-refining and tandem transportation
نویسندگان
چکیده
This article explores coordinated scheduling problem arising in steelmaking and multi-refining operations. Jobs are first processed in converters and then transported downstream to be processed in refining furnaces in which two different transporters are employed in tandem at the stage of transportation. There exist multi-refining jobs. The objective is to minimize the maximum completion time satisfying no transporters conflict and buffer space. For the model, we develop a tabu search algorithm and provide the worst case analysis. Computational tests are evaluated to show the efficiency brought by the tabu search algorithm relative to lower bound and sequenced and separately algorithm.
منابع مشابه
Steelmaking and refining coordinated scheduling problem with waiting time and transportation consideration
Article history: Available online 8 August 2009
متن کاملَA Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times
This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper presen...
متن کاملAn Improved Optimization Model for Scheduling of a Multi-Product Tree-Like Pipeline
In the petroleum supply chain, oil refined products are often delivered to distribution centers by pipelines since they provide the most reliable and economical mode of transportation over large distances. This paper addresses the optimal scheduling of a complex pipeline network with multiple branching lines. The main challenge is to find the optimal sequence and time of product injections/deli...
متن کاملA multi-objective memetic algorithm for risk minimizing vehicle routing problem and scheduling problem
In this paper, a new approach to risk minimizing vehicle routing and scheduling problem is presented. Forwarding agents or companies have two main concerns for the collection of high-risk commodities like cash or valuable commodities between the central depot and the customers: one; because of the high value of the commodities transported, the risk of ambush and robbery are very high. Two; the ...
متن کاملComplete Modification Rescheduling Method and Its Application for Steelmaking and Continuous Casting
Delayed processing time and machine failures upset the plan in steelmaking-continuous casting (SCC) production, which make production plan infeasible. The manual repairing cannot satisfy objectives of quick response and optimal scheduling. The practical rescheduling with 1-4 refining stages cannot abstract as three stages hybrid flow shop (HFS). A method is presented for the rescheduling proble...
متن کامل